Contracts - Information technology - Resource allocation - Scheduling - World Wide Web;
D O I:
暂无
中图分类号:
学科分类号:
摘要:
The drive to move away from made-to-stock and engineer-to-order operations towards make-to-order and assemble-to-order presents very specific challenges to the supporting information technology. Production scheduling in a true make-to-order environment becomes driven by actual contracts, and must support allocation and control of all resources within the organization, and not just the manufacturing resources. This represents a major shift from the traditional manufacturing resource planning model of doing a rough cut capacity plan to determine critical resource.
机构:
Virginia Polytech Inst & State Univ, Dept Ind & Syst Engn, Blacksburg, VA 24061 USAVirginia Polytech Inst & State Univ, Dept Ind & Syst Engn, Blacksburg, VA 24061 USA
Bish, EK
Muriel, A
论文数: 0引用数: 0
h-index: 0
机构:Virginia Polytech Inst & State Univ, Dept Ind & Syst Engn, Blacksburg, VA 24061 USA
Muriel, A
Biller, S
论文数: 0引用数: 0
h-index: 0
机构:Virginia Polytech Inst & State Univ, Dept Ind & Syst Engn, Blacksburg, VA 24061 USA
机构:
Helsinki Univ Technol, IIA Res Ctr, Dept Ind Management, FIN-02150 Espoo, FinlandHelsinki Univ Technol, IIA Res Ctr, Dept Ind Management, FIN-02150 Espoo, Finland
Jahnukainen, J
Lahti, M
论文数: 0引用数: 0
h-index: 0
机构:
Helsinki Univ Technol, IIA Res Ctr, Dept Ind Management, FIN-02150 Espoo, FinlandHelsinki Univ Technol, IIA Res Ctr, Dept Ind Management, FIN-02150 Espoo, Finland