Measurement and Control Techniques in Underground Pipeline Advance.

被引:0
|
作者
Stein, D.
Maass, H.-U.
Brune, P.
机构
来源
Tiefbau, Ingenieurbau, Strassenbau | 1986年 / 28卷 / 02期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
14
引用
收藏
页码:67 / 70
相关论文
共 50 条
  • [21] OPTIMIZER INVOKES ADAPTIVE STRATEGY FOR BEST SPARK ADVANCE.
    Anon
    Automotive Engineering International, 1978, 86 (07): : 36 - 39
  • [22] Lost in advance. When literature saves the vanquished of history
    Farah, Alain
    Livernois, Jonathan
    ANALYSES-REVUE DE CRITIQUE ET DE THEORIE LITTERAIRE, 2012, 7 (03): : 176 - 178
  • [24] DETERMINATION OF HEAT TRANSFER FROM THE ROCK INTO THE MINE ON FACE ADVANCE.
    Shcherban', A.N.
    Gerbut, K.K.
    Dobryanskiy, Yu.P.
    Heat Transfer - Soviet Research, 1975, 7 (01): : 137 - 139
  • [25] FLAW DETECTION AND RESISTANCE MEASUREMENT OF UNDERGROUND PIPELINE COATINGS.
    Takiguchi, Shuichiro
    Hachisu, Yoshio
    Ikeda, Shintaro
    Seino, Kiyomi
    Boshoku Gijutsu/Corrosion Engineering, 1973, 22 (09): : 383 - 392
  • [26] Mathematical models of the underground pipeline for problem of the corrosion control
    Dikmarova, Lyudmila P.
    Dzhala, Roman M.
    Journal of Automation and Information Sciences, 2000, 32 (02) : 42 - 50
  • [27] Asia in the making a Europe, vol 3, book 1: A century of advance.
    Subrahmanyam, S
    JOURNAL OF ASIAN STUDIES, 1999, 58 (04): : 1085 - 1086
  • [28] ZERO-INERTIA SURGE MODEL WITH WET-DRY ADVANCE.
    Wallender, W.W.
    Rayej, M.
    Transactions of the American Society of Agricultural Engineers, 1985, 28 (05): : 1530 - 1534
  • [29] WHAT IS THE CORPORATE GAME THESE DAYS, AND HOW CAN AN ENGINEER PLAY IT TO ADVANCE.
    Jacobs, E.Lowell
    Journal of professional issues in engineering, 1986, 112 (03): : 218 - 221
  • [30] ADVANCE ON UNDERGROUND RADARS
    SUZUKI, T
    ARAI, I
    IEICE TRANSACTIONS ON COMMUNICATIONS ELECTRONICS INFORMATION AND SYSTEMS, 1991, 74 (02): : 289 - 294