TOUGH NEW JACK-UP FOR ROUGH SEAS.

被引:0
|
作者
Anon
机构
来源
Ocean industry | 1984年 / 19卷 / 01期
关键词
OIL WELL DRILLING - Offshore;
D O I
暂无
中图分类号
学科分类号
摘要
Rowan Company's three deepwater jack-up Gorilla-class drilling rigs are designed for work in virtually all ice-free hostile environmental areas of the world. They will cost in excess of 85 million each, including owner-furnished drilling equipment. This, according to owners, will make them among the costliest jack-ups in the world. Another record being claimed by the Gorilla-class drilling units, is that they are the largest jack-ups in the world. Fully outfitted, a Gorilla contains 16,000 tons of steel. Its triangular hull measures 297 ft from bow to stern and 292 ft across the stern. The rig has a variable load of 2750 tons for drilling consumables and 42,265 sq ft of deck space. Its ample storage capacity, along with its 503-ft leg length, and certain design features, makes the rig compatible with hostile offshore areas, where it can continue drilling for long periods unattended.
引用
收藏
相关论文
共 50 条
  • [21] FATIGUE VULNERABILITY OF JACK-UP PLATFORMS - DISCUSSION
    CARLSEN, CA
    DOLAN, JL
    ELLIS, LG
    HAMBLY, EC
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1986, 80 : 291 - 296
  • [22] Laboratory measurements on replaceable jack-up systems
    Rodrigues, Marina
    Lanoye, Reinhilde
    Internoise 2022 - 51st International Congress and Exposition on Noise Control Engineering, 2022,
  • [23] Jack-up reinstallation near a footprint cavity
    Kong, V. W.
    Cassidy, M. J.
    Gaudin, C.
    PHYSICAL MODELLING IN GEOTECHNICS, VOLS. 1 AND 2, 2010, : 1033 - 1038
  • [24] Jack-up assessment - Past, present and ISO
    Hoyle, Mike
    Stiff, John
    Hunt, Rupert
    Morandi, Alberto
    PROCEEDINGS OF THE SIXTEENTH (2006) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 1, 2006, : 39 - +
  • [25] Second mobile jack-up from DWSEA
    不详
    NAVAL ARCHITECT, 2009, : 16 - 16
  • [26] PENETRATION OF JACK-UP PLATFORM FOOTINGS INTO THE SEABED
    WERNO, M
    JUSZKIEWICZBEDNARCZYK, B
    INEROWICZ, M
    MARINE GEOTECHNOLOGY, 1987, 7 (02): : 65 - 78
  • [27] FATIGUE DESIGN OF RACKS FOR JACK-UP UNITS
    HONDA, H
    JOURNAL OF MECHANISMS TRANSMISSIONS AND AUTOMATION IN DESIGN-TRANSACTIONS OF THE ASME, 1986, 108 (03): : 403 - 412
  • [28] A comparison of jacket and jack-up structural reliability
    Dier, A.F
    Morandi, A.C
    Smith, D.
    Birkinshaw, M.
    Dixon, A.
    Marine Structures, 2001, 14 (4-5) : 507 - 521
  • [29] Digital Twin of a Generic Jack-Up Platform
    Technology Centre for Offshore Marine
    不详
    Proc. Annu. Offshore Technol. Conf., 1600,
  • [30] Discussion on Application of the multifunctional jack-up platform
    Yang, Yanhua
    Jin, Shucheng
    Zhang, Yongtao
    ADVANCED MECHANICAL DESIGN, PTS 1-3, 2012, 479-481 : 1059 - 1065