Experience in smooth blasting during excavation of the pits for the core of the Rogun Dam

被引:0
|
作者
Azarkovich, A.E.
Shuifer, M.I.
Fedorov, I.L.
机构
来源
Hydrotechnical Construction | 1989年 / 22卷 / 09期
关键词
2;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:530 / 536
相关论文
共 50 条
  • [21] Safety threshold of blasting vibration velocity in foundation excavation of Baihetan super-high arch dam
    Xia, Wenjun
    Lu, Wenbo
    Wang, Gaohui
    Yan, Peng
    Liu, Da
    Leng, Zhendong
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2020, 79 (09) : 4999 - 5012
  • [22] Safety threshold of blasting vibration velocity in foundation excavation of Baihetan super-high arch dam
    Wenjun Xia
    Wenbo Lu
    Gaohui Wang
    Peng Yan
    Da Liu
    Zhendong Leng
    Bulletin of Engineering Geology and the Environment, 2020, 79 : 4999 - 5012
  • [23] Experience in use of system for non-electric blasting at open pits in Novosibirsk region
    Obgol'ts, A.A.
    Kumov, V.S.
    Raspopov, B.P.
    Grishin, A.N.
    Bezopasnost' Truda v Promyshlennosti, 2002, (11): : 7 - 9
  • [24] Attenuation formula of the dominant frequency of blasting vibration during tunnel excavation
    Liu D.
    Lu W.
    Chen M.
    Yan P.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2018, 37 (09): : 2015 - 2026
  • [25] Rock mass damaged zone caused by blasting during tunnel excavation
    Zona oštećenja stijenske mase pri iskopu tunela miniranjem
    1600, University of Zagreb, Faculty of Mining, Geology and Petroleum Engineering (24):
  • [26] ROCK MASS DAMAGED ZONE CAUSED BY BLASTING DURING TUNNEL EXCAVATION
    Anticevic, Hrvoje
    Dobrilovic, Mario
    Perkovic, Hrvoje
    RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK, 2012, 24 (01): : 1 - 9
  • [27] Reasons for arising the fires and facilities for their preventing during the blasting operations at open pits
    Gorkovenko, V.P.
    Panchishin, V.Ya.
    Bezopasnost' Truda v Promyshlennosti, 2001, (06): : 27 - 30
  • [28] Smooth blasting technique with large diameter bore hole used in rock excavation for high slope
    Luo, Dahui
    Xu, Bingsheng
    Changjiang Kexueyuan Yuanbao/ Journal of Yangtze River Scientific Research Institute, 16 (04): : 53 - 55
  • [29] Uplift displacement of soldier piles during stepped excavation of deep foundation pits
    Lou, Xiao-Ming
    Yang, Jing
    Li, De-Ning
    Liu, Jian-Hang
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2013, 35 (01): : 193 - 198
  • [30] Comparative analysis of blasting disturbance under different hole arrangements in presplitting excavation of gentle slope of dam foundation
    Gao Q.
    Zhang C.
    Fan Y.
    Zhou H.
    Lu W.
    Leng Z.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2024, 46 (05): : 1018 - 1029