Heat Loads in the Boiler Furnace of a 800-MW Power-Generating Unit Burning Natural Gas

被引:0
|
作者
NPO TsKTI, ul. Krasnykh Kotel'shchikov 3/6, St. Petersburg 193167, Russia [1 ]
机构
来源
Therm Eng | / 5卷 / 411-414期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] To selecting the thermal scheme of technical re-equipment of 800 MW power-generating unit operating on Kansko-Achniskij coal
    Lipets, A.U.
    Kuznetsova, S.M.
    Burenkova, R.B.
    Energetik, 2002, (10): : 9 - 10
  • [32] Analyzing the Possibility of Reducing Power Loss in a Cooled Power-Generating Gas Turbine Unit
    Balashov, Yu A.
    Berezinets, P. A.
    Ageev, A., V
    Belyakov, A., V
    Taradai, D., V
    THERMAL ENGINEERING, 2019, 66 (09) : 626 - 634
  • [33] Analyzing the Possibility of Reducing Power Loss in a Cooled Power-Generating Gas Turbine Unit
    Yu. A. Balashov
    P. A. Berezinets
    A. V. Ageev
    A. V. Belyakov
    D. V. Taradai
    Thermal Engineering, 2019, 66 : 626 - 634
  • [34] CERTAIN FEATURES OF AERODYNAMICS OF THE FURNACE CHAMBER IN THE GAS OIL-FIRED TGMP-204P BOILER OF AN 800 MW GENERATING-UNIT WITH A BOTTOM ARRANGEMENT OF BURNERS
    CHUPROV, VV
    USMAN, YM
    ABRYUTIN, AA
    ANTONOV, AY
    ZHIVAEV, AS
    KOZLOV, VG
    LEVIN, MM
    THERMAL ENGINEERING, 1990, 37 (02) : 66 - 70
  • [35] COMBINED-CYCLE POWER PLANT OF 800 MW CAPACITY FOR CENTRAL POWER STATIONS BURNING NATURAL GAS.
    Chernetskii, N.S.
    Ol'khovskii, G.G.
    Berezinets, P.A.
    Rublev, V.Ya
    Svyatov, V.A.
    Gusev, V.N.
    Borodin, A.A.
    Thermal Engineering (English translation of Teploenergetika), 1985, 32 (09): : 485 - 491
  • [36] An analysis of problems arising during operation of the Perm district power plant 800-MW power unit at sliding pressure
    Avrutsky G.D.
    Zakharov A.E.
    Sargsyan V.A.
    Frolov M.S.
    Schwartz A.L.
    Adamov A.S.
    Therm. Eng., 9 (615-620): : 615 - 620
  • [37] ANALYSIS OF OPERATION OF THE FURNACE CHAMBER AND OF THE PF PREPARATION SYSTEM OF A P-57R BOILER BURNING EKIBASTUZ COAL, FOR A 500MW POWER GENERATING-UNIT
    SHAGALOVA, SL
    MALYSHEVA, VS
    CHAVCHANIDZE, EK
    PARSHIKOV, DI
    SOTNIKOV, IA
    PETROV, EV
    GALUSKIN, VB
    THERMAL ENGINEERING, 1983, 30 (03) : 150 - 155
  • [38] AN ANALYSIS OF THE DYNAMICS OF A MULTICONNECTED SYSTEM OF CONTROL OF POWER AND TEMPERATURE OF A POWER-GENERATING UNIT WITH A ONCE-THROUGH BOILER
    BILENKO, VA
    DAVYDOV, NI
    CHESNOKOVSKII, VZ
    ROSICH, NP
    THERMAL ENGINEERING, 1987, 34 (10) : 528 - 534
  • [39] THE MAIN RESULTS OF TESTING THE FURNACE CHAMBER OF THE TGMP-1202 BOILER OF THE 1200-MW POWER GENERATING-UNIT
    STOROZHUK, YP
    ABRYUTIN, AA
    ENYAKIN, YP
    SHTALMAN, SG
    ZHMERIK, NG
    GRISHIN, AD
    TARAN, OE
    THERMAL ENGINEERING, 1985, 32 (08) : 454 - 458
  • [40] Features of the starting system of the PGU-800 combined-cycle power-generating unit
    Shmukler, B.I.
    Livshits, M.A.
    Gombolevskii, V.I.
    Shil'dkret, I.M.
    Thermal Engineering (English translation of Teploenergetika), 1988, 35 (11): : 612 - 615