Heat Loads in the Boiler Furnace of a 800-MW Power-Generating Unit Burning Natural Gas

被引:0
|
作者
NPO TsKTI, ul. Krasnykh Kotel'shchikov 3/6, St. Petersburg 193167, Russia [1 ]
机构
来源
Therm Eng | / 5卷 / 411-414期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Heat loads in the boiler furnace of a 800-MW power-generating unit burning natural gas
    Sokolov, V.V.
    Litvinova, L.A.
    Thermal Engineering (English translation of Teploenergetika), 1998, 45 (05):
  • [2] Heat loads in the boiler furnace of a 800-MW power generating unit burning natural gas
    NPO TsKTI, Sankt-Peterburg, Russia
    Teploenerg, 5 (55-58):
  • [3] Thermionic topping of the boiler of an 800 MW power-generating unit
    Berezinets, P.A.
    Kachalin, E.A.
    Thermal Engineering (English translation of Teploenergetika), 1988, 35 (11): : 636 - 639
  • [4] THERMIONIC TOPPING OF THE BOILER OF AN 800-MW POWER GENERATING-UNIT
    BEREZINETS, PA
    KACHALIN, EA
    THERMAL ENGINEERING, 1988, 35 (11) : 636 - 639
  • [5] MATHEMATICAL INVESTIGATION OF OPERATIONAL MODES OF THE FURNACE CHAMBER OF A BOILER FOR AN 800-MW GENERATING-UNIT
    MITOR, VV
    SHAGALOVA, SL
    PARSHIKOV, DI
    KHRISTICH, LM
    PARPAROV, DI
    FEDOTOV, PN
    THERMAL ENGINEERING, 1981, 28 (02) : 39 - 43
  • [6] Adapting the code Furnace for calculations of heat transfer in the boiler furnace of a 575-MW power-generating unit
    Karasina, L.S.
    Livshits, B.N.
    Chudnovskii, B.
    Talanker, A.
    Abryutin, A.A.
    Thermal Engineering, 2000, 47 (11) : 1031 - 1036
  • [7] An integrated computer-based training simulator for the operative personnel of the 800-MW power-generating unit at the Perm District Power Station
    Pevneva N.Yu.
    Piskov V.N.
    Zenkov A.N.
    Thermal Engineering, 2007, 54 (07) : 542 - 547
  • [8] Operational reliability and service life of station steam conduits of active 800-MW power-generating units
    Zlepko V.F.
    Perevezentseva T.V.
    Khromchenko F.A.
    Shvetsova T.A.
    Kreitser K.K.
    Power Technology and Engineering, 2004, 38 (1) : 30 - 36
  • [9] System of Optimization of the Burning Process for an 800 MW Power Unit Boiler.
    Gorelik, A.Kh.
    Duel', M.A.
    Rozenbaum, I.D.
    Solodovnikov, V.N.
    Teploenergetika, 1980, (05): : 50 - 54
  • [10] Results from tests of the P-67 boiler used as part of a 800-MW power unit
    Greben'kov P.Y.
    Vasil'ev V.V.
    Borisov V.N.
    Petrov V.N.
    Kardashov A.S.
    Porozov S.V.
    Yanov S.R.
    Nazarov M.N.
    Maidanik M.N.
    Thermal Engineering, 2011, 58 (12) : 973 - 980