Risks involved in reengineering projects

被引:0
|
作者
Sneed, Harry M.
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:204 / 211
相关论文
共 50 条
  • [31] Risks in Students' Software Projects
    Ahtee, Tero
    Poranen, Timo
    22ND CONFERENCE ON SOFTWARE ENGINEERING EDUCATION AND TRAINING, PROCEEDINGS, 2009, : 154 - +
  • [32] Managing Risks in Complex Projects
    Thamhain, Hans
    PROJECT MANAGEMENT JOURNAL, 2013, 44 (02) : 20 - 35
  • [33] Achieving high quality in outsourcing reengineering projects throughout extreme programming
    Xu, B
    Yang, XH
    He, ZJ
    Maddineni, SR
    2004 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN & CYBERNETICS, VOLS 1-7, 2004, : 2131 - 2136
  • [34] Get involved in IAS projects
    Mills, T. David
    IEEE Industry Applications Magazine, 2008, 14 (02) : 5 - 7
  • [35] Human Aspect in Reengineering Projects-Conclusions from Industrial Application
    Pawlewski, Pawel
    Cempel, Witold A.
    HUMAN FACTORS AND ERGONOMICS IN MANUFACTURING & SERVICE INDUSTRIES, 2011, 21 (02) : 164 - 177
  • [36] A FORMAL METHODOLOGY FOR SUBJECT AREA IDENTIFICATION IN IEF(TM) REENGINEERING PROJECTS
    BANERJEE, D
    SIMPSON, CL
    JOURNAL OF COMPUTER INFORMATION SYSTEMS, 1994, 34 (04) : 37 - 39
  • [37] A Meta-model Integrating Software Reengineering in the Context of BPR Projects
    Ayachi-Ghannouchi, Sonia
    Belaazi, Mehrzia
    ENTERPRISE INFORMATION SYSTEMS, PT 1, 2011, 219 : 331 - 340
  • [38] Stakeholder analysis as a medium to aid change in information system reengineering projects
    Davison, J
    Deeks, D
    Bruce, L
    INTERNATIONAL CONFERENCE ON POLITICS AND INFORMATION SYSTEMS: TECHNOLOGIES AND APPLICATIONS, PROCEEDINGS, 2003, : 126 - 131
  • [39] SMALLPOX VACCINATION - RISKS ARE INVOLVED
    GOODWIN, CS
    MEDICAL JOURNAL OF AUSTRALIA, 1981, 1 (03) : 139 - 139
  • [40] Soccer heading: Are there risks involved?
    Broglio, SP
    Guskiewicz, KM
    ATHLETIC THERAPY TODAY, 2001, 6 (01): : 28 - 32