共 50 条
- [32] Offshore Cable Installation 9TH INTERNATIONAL WORKSHOP ON LARGE-SCALE INTEGRATION OF WIND POWER INTO POWER SYSTEMS AS WELL AS ON TRANSMISSION NETWORKS FOR OFFSHORE WIND POWER PLANTS, 2010, : 316 - 322
- [36] DESIGN, INSTALLATION, AND OPERATION OF NEW HODOSCOPE COLLIMATOR AT TREAT TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1976, 24 (NOV19): : 273 - 274
- [37] CONSIDERATIONS IN THE DESIGN, INSTALLATION AND OPERATION OF A COMPLETE SOUNDING SYSTEM INTERNATIONAL HYDROGRAPHIC REVIEW, 1984, 61 (02): : 51 - 55
- [38] The engineering communication networks - the issues of use of standards for the information representation in design, construction and operation XXV POLISH - RUSSIAN - SLOVAK SEMINAR -THEORETICAL FOUNDATION OF CIVIL ENGINEERING, 2016, 153 : 261 - 265