共 50 条
- [41] Experience With Corrective Surgery for Postburn Contractures in Mumbai, India JOURNAL OF BURN CARE & RESEARCH, 2012, 33 (03): : E120 - E126
- [43] Local network management system an experience in AM/FM project implementation in Telekom Malaysia CONFERENCE XXI - AM/FM INTERNATIONAL, PROCEEDINGS, 1998, : 603 - 613
- [44] Design and Implementation of an Enterprise Integrated Project Environment: Experience from an Information Systems Program 2017 IEEE FRONTIERS IN EDUCATION CONFERENCE (FIE), 2017,
- [45] Dinner Table Experience in the Flyover Provinces: A Bricolage of Rural Deaf and Disabled Artistry in Saskatchewan SOCIAL SCIENCES-BASEL, 2023, 12 (03):
- [46] Repurposing of reception shaft, Mumbai Coastal Road Project Case study PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 1847 - 1854
- [50] PROJECT IMPLEMENTATION. TAPPI (Technical Association of the Pulp and Paper Industry), CA Report, 1975, (59):