共 50 条
- [41] New integrated control system for the reheating furnace of the hot strip mill at Wakayama steel works Morita, Kenji, 1600, (41):
- [42] NEW DEVELOPMENTS IN ROD MILLS. PART II - OPERATION OF A SPECIALTY STEEL WIRE ROD FINISHING MILL AT TOYAMA WORKS. Iron and Steel Engineer, 1986, 63 (12): : 41 - 46
- [43] New OBM Steel Shop at USINOR'S Neuves-Maisons Works. Cahiers d'Informations Techniques - Revue de Metallurgie, 1981, 78 (12): : 921 - 935
- [44] OUTLINE OF THE NEW INSPECTION AND FINISHING LINE AT THE BAR MILL IN KOKURA STEEL WORKS. Sumitomo Metals, 1986, 38 (02): : 127 - 131
- [45] New Scheduling Algorithm for Shipping Operation in Steel Works JFE Technical Report, 2023, (30): : 52 - 56
- [47] EXPERIENCE IN OPERATION AND MAINTENANCE OF MATERIALS HANDLING PLANT AT BRITISH STEEL CORPORATION'S RAVENSCRAIG AND HUNTERSTON WORKS. Steel Times, 1983, 211 (01): : 10 - 12
- [48] Integrated automation and control of slab caster no. 2 C-line at U.S. steel, Gary works Iron and Steel Engineer, 1993, 70 (11):
- [49] THE FEATURES OF NO-3 CONTINUOUS CASTER AT KAKOGAWA WORKS, KOBE-STEEL-LTD, AND THE QUALITY OF THEIR PRODUCTS TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (12): : S837 - S837
- [50] DEVELOPMENT OF CONTINUOUS-CASTING FOR STAINLESS-STEEL SQUARE BLOOM .1. EQUIPMENT AND OPERATION OF BILLET CASTER FOR STAINLESS-STEEL WIRE ROD TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S973 - S973