共 50 条
- [21] EXPERIENCE GAINED IN OPERATION OF INDUCTION CRUCIBLE FURNACES AT THE BAKU' ″ELEKTROTSENTROLIT″ PLANT. Soviet electrical engineering, 1981, 52 (07): : 27 - 30
- [22] APPROXIMATE METHOD OF TAKING INTO ACCOUNT THE DISSOCIATION OF GASES IN THE OPERATION OF A POWER PLANT. Power engineering New York, 1985, 23 (02): : 149 - 151
- [23] COMPUTER SECURITY - PREVENTION: LESSONS FROM THE OPERATION OF A NUCLEAR POWER PLANT. Computers and Security, 1986, 5 (02): : 122 - 127
- [24] STARTUP AND OPERATION OF THE KIDD CREEK ZINC SULFIDE PRESSURE LEACHING PLANT. Minerals and Metallurgical Processing, 1986, 3 (01): : 1 - 7
- [25] Effects of a Gasoline Accident of the Purifying Efficiency and Operation of an Activated Sludge Plant. GWF, Wasser - Abwasser, 1984, 125 (05): : 270 - 273
- [26] FIRST EXPERIENCE GAINED DURING THE OPERATION OF THE BOTTROP COAL OIL PLANT. Erdoel und Kohle, Erdgas, Petrochemie vereinigt mit Brennstoff-Chemie, 1983, 36 (08): : 373 - 376
- [27] Experience of Operation of District Heating Installations at the Beloyarskayh Nuclear Power Plant. Teploenergetika, 1978, (06): : 17 - 20
- [28] OPERATION OF VARIABLE AND CONSTANT SPEED PUMPS AT THE NASHUA WASTEWATER TREATMENT PLANT. Journal of the New England Water Pollution Control Association, 1976, 10 (01): : 44 - 54
- [30] DEPLOYMENT AND OPERATION OF THE 50KW MINI-OTEC PLANT. Proceedings of the Annual Offshore Technology Conference, 1980, 1 : 79 - 84