共 50 条
- [41] Optimized Model of Slotted Liners Completion Parameters in Horizontal Well SUSTAINABLE DEVELOPMENT OF NATURAL RESOURCES, PTS 1-3, 2013, 616-618 : 804 - 811
- [43] Research and application of the deep horizontal drilling and completion technology for Liaohe oilfield buried hill reservoir INDUSTRIAL INSTRUMENTATION AND CONTROL SYSTEMS, PTS 1-4, 2013, 241-244 : 1396 - +
- [44] Technical study of horizontal well used for low permeability and abundance oilfield exploitation Proceedings of the World Engineers' Convention 2004, Vol F-A, Resources and Energy, 2004, : 335 - 340
- [45] LOGGING METHOD FOR DETERMINING HORIZONTAL VELOCITY OF WATER IN OILFIELD FORMATIONS JOURNAL OF PETROLEUM TECHNOLOGY, 1980, 32 (04): : 675 - 684
- [46] A Theoretical Optimization Method Applied in Oilfield Developed with Horizontal Patterns PROGRESS IN ENVIRONMENTAL PROTECTION AND PROCESSING OF RESOURCE, PTS 1-4, 2013, 295-298 : 3333 - +
- [47] Genetic analysis of low resistive reservoir in Banqiao region of Dagang oilfield Jianghan Shiyou Xueyuan Xuebao/Journal of Jianghan Petroleum Institute, 2001, 23 (SUPPL.): : 66 - 68
- [48] Application of NPV Method in Oilfield Well Pattern Design CALL OF PAPER PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, 2008, : 645 - 649
- [49] Impact of formation damage and completion impairment on horizontal-well productivity JOURNAL OF PETROLEUM TECHNOLOGY, 1998, 50 (10): : 72 - 73
- [50] Study on Gravel Pack Completion Sand Control Technology in Horizontal Well ENVIRONMENTAL TECHNOLOGY AND RESOURCE UTILIZATION II, 2014, 675-677 : 1561 - 1564