共 50 条
- [41] CO2 emission on the process of desulphurization projects during "11th Five-Year Plan" period 2010 4TH INTERNATIONAL CONFERENCE ON BIOINFORMATICS AND BIOMEDICAL ENGINEERING (ICBBE 2010), 2010,
- [42] Principal Lines of Development of Manufacture of High Parameter Power Plant Fittings in the Eleventh Five Year Plan Period. Energomashinostroenie, 1982, (09): : 5 - 7
- [46] Trends in Hospitalization of Children with High-Frequency Diseases; A Nine-Year Retrospective Study INTERNATIONAL JOURNAL OF PEDIATRICS-MASHHAD, 2020, 8 (11): : 12339 - 12348