Heuristic risk assessment using cost factors

被引:0
|
作者
Univ of Southern California, Los Angeles, United States [1 ]
机构
来源
IEEE Software | / 3卷 / 51-59期
关键词
Computational methods - Computer software - Cost accounting - Expert systems - Heuristic methods - Project management - Wide area networks;
D O I
暂无
中图分类号
学科分类号
摘要
Risk management practices may improved by leveraging on existing knowledge and expertise during cost estimation activities through the use of cost factors to detect patterns of project risk. The technique is an extension of the Constructive Cost Model (Cocomo) which supports project planning by identifying, categorizing, quantifying, and prioritizing project risks. The method described is encapsulated in a tool called Expert Cocomo II, and is intended to be used in conjunction with other management techniques. The extended method also detects cost estimate input anomalies and provides risk control advice in addition to conventional Cocomo cost and schedule calculation.
引用
收藏
相关论文
共 50 条
  • [41] Preoperative Assessment of Risk Factors
    Tassler, Andrew
    Kaye, Rachel
    OTOLARYNGOLOGIC CLINICS OF NORTH AMERICA, 2016, 49 (03) : 517 - +
  • [42] OSTEOPOROSIS RISK ASSESSMENT USING THE IOF AND FRAX QUESTIONS AND OTHER FACTORS
    Zayeava, A.
    Shaduro, D.
    Teifukova, E.
    Kulanthaivel, S.
    Kaliberdenko, V.
    Balasundaram, K.
    OSTEOPOROSIS INTERNATIONAL, 2021, 32 (SUPPL 1) : S328 - S329
  • [43] OSTEOPOROSIS RISK ASSESSMENT USING IOF AND FRAX QUESTIONNAIRES AND OTHER FACTORS
    Zayaeva, A.
    Yatskov, I.
    Klimchuk, A.
    Beloglazov, V.
    Kaliberdenko, V.
    Shadchneva, N.
    Shaduro, D.
    Kulieva, E.
    Kulanthaivel, S.
    AGING CLINICAL AND EXPERIMENTAL RESEARCH, 2024, 36 : S585 - S585
  • [44] ASSESSMENT OF RISK FACTORS FOR OSTEOPOROSIS IN YOUNG ADULTS BY USING A DIGITAL INTERFACE
    Copotoiu, M.
    Hulub, M.
    Popoviciu, H. V.
    Cristina, J.
    Palaghie, A.
    Bogatan, C.
    Susca, M.
    Bordean, L.
    OSTEOPOROSIS INTERNATIONAL, 2016, 27 : S517 - S518
  • [45] Route assessment using comparative risk factors integrated through a GIS
    Toth, DM
    OConnell, WJ
    HIGH LEVEL RADIOACTIVE WASTE MANAGEMENT, 1996 ., 1996, : 363 - 365
  • [46] A misclassification cost risk bound based on hybrid particle swarm optimization heuristic
    Pendharkar, Parag C.
    EXPERT SYSTEMS WITH APPLICATIONS, 2014, 41 (04) : 1483 - 1491
  • [47] Risk Factors Correlated With Risk of Insulin Resistance Using Homeostasis Model Assessment in Adolescents in Taiwan
    Lin, Shiyng-Yu
    Su, Chien-Tien
    Hsieh, Yi-Chen
    Li, Yu-Ling
    Chen, Yih-Ru
    Cheng, Shu-Yun
    Hu, Chien-Ming
    Chen, Yi-Hua
    Hsieh, Fang-I
    Chiou, Hung-Yi
    ASIA-PACIFIC JOURNAL OF PUBLIC HEALTH, 2015, 27 (02) : NP476 - NP484
  • [48] Breast cancer risk assessment using genetic variants and risk factors in a Singapore Chinese population
    Lee, Charmaine Pei Ling
    Irwanto, Astrid
    Salim, Agus
    Yuan, Jian-min
    Liu, Jianjun
    Koh, Woon Puay
    Hartman, Mikael
    BREAST CANCER RESEARCH, 2014, 16 (03)
  • [49] Main Contributing Factors and the Heuristic Approach for Assessing Risk at Mass Gatherings
    Torkjazi M.
    Farrokhvar L.K.
    Kamali B.
    Operations Research Forum, 3 (1)
  • [50] Assessment of External Risk Factors on Construction Project Schedule Using Risk Importance Index (RH)
    Husin, Saiful
    Abdullah
    Riza, Medyan
    Afifuddin, Mochammad
    PERTANIKA JOURNAL OF SCIENCE AND TECHNOLOGY, 2019, 27 (04): : 2031 - 2047