共 50 条
- [41] Operating Experience with the Quick-Start Intermediate-Load Units 21 and 22 at the Kyndby Power Plant. 1978, 58 (11): : 809 - 812
- [42] PICKERING POWER-STATION REACTORS AND TURBINE-GENERATORS DESIGN FEATURES AND INITIAL OPERATING EXPERIENCE COMBUSTION, 1973, 45 (01): : 35 - 35
- [43] EXPERIMENTAL-MEASUREMENT OF THE GRAVITY COEFFICIENT OF COOLANT REACTIVITY FOR REACTORS AT THE BILIBINSK ATOMIC COMBINED ELECTRIC-POWER AND HEAT-GENERATING PLANT SOVIET ATOMIC ENERGY, 1979, 46 (02): : 81 - 85
- [44] Operating Conditions in Starting Gas and Oil-fired 800 MW Monoblocks at Uglegorsk State District Power Plant. Teploenergetika, 1981, (09): : 36 - 39
- [45] REACTOR CORE PHYSICS DESIGN AND OPERATING DATA FOR CYCLES 1 AND 2 OF THE ZION UNIT 2 PWR POWER PLANT. Electric Power Research Institute (Report) EPRI NP, 1979, (1232):
- [47] Optimization of the Structural and Functional Features of a Recovery Steam Generator Downstream of a Gas Turbine in a Combined Cycle Power Plant. Termotecnica Milano, 1987, 41 (12): : 33 - 44
- [48] INFLUENCE OF ATOMIC POWER PLANT OPERATING REGIME ON SELECTION OF TURBINE-UNIT PARAMETERS. Power engineering New York, 1983, 21 (04): : 1 - 7
- [49] Features of electric power plants operating with renewable energy sources (RES) and the ways of increasing their efficiency Gidrotekhnicheskoe Stroitel'stvo, 2001, (01): : 33 - 37