共 50 条
- [41] FUKUSHIMA II-2: IMPROVED AND STANDARDIZED NUCLEAR POWER PLANT. Hitachi Review, 1984, 33 (06): : 275 - 280
- [42] Experience of Operation of District Heating Installations at the Beloyarskayh Nuclear Power Plant. Teploenergetika, 1978, (06): : 17 - 20
- [43] DESIGN OF A BYPASSED AND INOPERABLE STATUS MONITORING SYSTEM FOR A NUCLEAR POWER PLANT. IEEE transactions on power apparatus and systems, 1985, PAS-104 (02): : 242 - 248
- [47] CALCULATING PRIMARY FUEL LOAD OF A NUCLEAR REACTOR AND PLANNING THE FUEL COMPONENT AT A NUCLEAR POWER PLANT. Soviet power engineering, 1982, 11 (03): : 183 - 186
- [48] American steam power plant. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1908, 52 : 941 - 952
- [49] RELIABILITY EXPERIENCES AT AN OPERATING NUCLEAR PLANT. Proceedings of the Annual Reliability and Maintainability Symposium, 1981, : 334 - 333
- [50] Biocorrosion at Embalse Nuclear Power Plant. Analysis of the Effect of a Biocide Product. INTERNATIONAL CONGRESS OF SCIENCE AND TECHNOLOGY OF METALLURGY AND MATERIALS, SAM - CONAMET 2013, 2015, 8 : 101 - 107