共 50 条
- [43] EFFECT OF PIPE RESTRAINT ON THE CONSERVATISM OF LEAK-BEFORE-BREAK DESIGN OF NUCLEAR POWER PLANT ASME PRESSURE VESSELS AND PIPING CONFERENCE - 2015, VOL 6A, 2015,
- [45] THE IMPACT OF IGNALINA NUCLEAR POWER PLANT WASTE WATER ON LAKE DRUKSIAI BEFORE THE DECOMMISSIONING OF THE PLANT (2007-2009) ADVANCED WATER SUPPLY AND WASTEWATER TREATMENT: A ROAD TO SAFER SOCIETY AND ENVIRONMENT, 2010, : 277 - 286
- [46] Connecting A Nuclear Power Plant to A Weak Grid The Case of Rooppur Nuclear Power Plant and Bangladesh Power System PROCEEDINGS OF 2020 11TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING (ICECE), 2020, : 282 - 285
- [47] The Rooppur nuclear power plant: is Bangladesh really ready for nuclear power? JOURNAL OF WORLD ENERGY LAW & BUSINESS, 2015, 8 (01): : 20 - 25
- [48] Ⅳ. Electrochemical measurements in various environments ―nuclear power plant (i electrochemical measurement in nuclear power plant)― Zairyo to Kankyo/ Corrosion Engineering, 2019, 68 (01): : 2 - 8
- [50] COMPLETION OF THE MULHEIM-KARLICH NUCLEAR-POWER STATION ATOMWIRTSCHAFT-ATOMTECHNIK, 1986, 31 (07): : 373 - 379