共 50 条
- [2] EXPERIENCE WITH EXTENDED POWER UPRATE AT LEIBSTADT NUCLEAR POWER PLANT PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, VOL 7, 2009, : 71 - 78
- [3] Experience in the Starting Up of the Leibstadt Nuclear Power Plant. VGB-Kraftwerkstechnik, 1986, 66 (05): : 427 - 432
- [4] LEIBSTADT-NUCLEAR-POWER-STATION IN OPERATION - EXPERIENCE AND CONSEQUENCES FOR FUTURE NUCLEAR-PLANT PROJECTS BROWN BOVERI REVIEW, 1987, 74 (01): : 20 - 26
- [5] EXPERIENCE GAINED FROM ERECTION AND COMMISSIONING OF THE 940 MW NUCLEAR-POWER PLANT AT LEIBSTADT BROWN BOVERI REVIEW, 1984, 71 (3-4): : 104 - 114
- [8] CONDENSER RETROFIT IN LEIBSTADT NUCLEAR POWER PLANT (BWR)-FAR BEYOND A STANDARD MODULAR SOLUTION PROCEEDINGS OF ASME TURBO EXPO 2023: TURBOMACHINERY TECHNICAL CONFERENCE AND EXPOSITION, GT2023, VOL 10, 2023,
- [9] Decontamination and disposal of components from the Leibstadt nuclear power station ATW-INTERNATIONALE ZEITSCHRIFT FUR KERNENERGIE, 1997, 42 (07): : 457 - 459
- [10] Potential options for the completion of the Temelin Nuclear Power Plant. PROCEEDINGS OF THE 10TH INTERNATIONAL SCIENTIFIC CONFERENCE ELECTRIC POWER ENGINEERING 2009, 2009, : 106 - 111