Organization of the Combustion of Kansk-Achinsk Coals in the Steam Boilers of the 300-MW Power-Generating Units at the Ryazanskaya District Power Station

被引:0
|
作者
Moscow Power Institute , ul. Krasnokazarmennaya 14, Moscow 111250, Russia [1 ]
不详 [2 ]
机构
来源
Thermal Engineering | 1998年 / 45卷 / 06期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:439 / 445
相关论文
共 35 条
  • [21] Solution of Problems with the Burning of Coals from the Kansk-Achinsk Basin in the P-49 Boiler of a 500 MW Unit at the Nazarovo State Regional Electric Power Plant
    Skuditskiy V.E.
    Anoshin R.G.
    Roundyguine Y.A.
    Mikhaylov V.V.
    Ryzhikov N.V.
    Grigoryev K.A.
    Power Technology and Engineering, 2017, 51 (2) : 220 - 225
  • [22] RESULTS OF COMPREHENSIVE IMPROVEMENT OF 300 MW GENERATING UNITS AT KARMANOVO-CENTRAL-POWER-STATION
    ABDURASHITOV, SR
    FILATEVA, IA
    GAVRILOV, AF
    ZEGER, KE
    EFIMOCHKIN, GI
    KHAKIMOV, AG
    KROKHALEV, BM
    THERMAL ENGINEERING, 1976, 23 (04) : 6 - 9
  • [23] Investigating the starting modes of the 300-MW power unit at the Kashira district power station at sliding pressure in the entire steam-water path of its TGMP-314 boiler
    Shvarts A.L.
    Gombolevskii V.I.
    Chugreev A.A.
    Skuratov A.V.
    Konovalov V.K.
    Yashkin O.V.
    Therm Eng, 2008, 9 (719-724): : 719 - 724
  • [24] INVESTIGATING RELIABILITY OF REHEAT SYSTEMS OF 300 MW POWER-GENERATING UNITS WITH TGMP-314A AND TGMP-314P BOILERS WITH STEAM TEMPERATURE OF 545-565 degree C.
    Zelenskii, V.G.
    Magadeev, V.Sh.
    Plotnikov, V.P.
    Zharkova, L.P.
    Thermal Engineering (English translation of Teploenergetika), 1987, 34 (05): : 254 - 257
  • [25] An integrated computer-based training simulator for the operative personnel of the 800-MW power-generating unit at the Perm District Power Station
    Pevneva N.Yu.
    Piskov V.N.
    Zenkov A.N.
    Thermal Engineering, 2007, 54 (07) : 542 - 547
  • [26] INCREASING EFFICIENCY OF COMBUSTION OF EKIBASTUZ COAL IN 300 MW UNITS AT TROITSK-CENTRAL-POWER-STATION
    IVANOV, AG
    GONCHARO.AI
    KISELMAN, LA
    YUDIN, IP
    MELENTEV, VA
    GUSIKHIN, YP
    THERMAL ENGINEERING, 1971, 18 (01) : 19 - &
  • [27] EXTENSION OF THE CONTROL RANGE OF 210 MW POWER-GENERATING UNITS WITH EP-640-140 (TGM-104) BOILERS.
    Grechanyi, A.N.
    Thermal Engineering (English translation of Teploenergetika), 1987, 34 (05): : 246 - 249
  • [29] Results of modernization of settings of boiler-feed turbo-pumps for power-generating units with 300, 500 MW capacities
    Chegurko, L.E.
    Neujmin, V.M.
    Tsimmerman, S.D.
    Bogun, V.S.
    Kal'nishevskij, V.Ya.
    2003, Energoprogress
  • [30] Turbine Installations for Technical Reequipment of Coal-Fired Power-Generating Units with K-300-23.5 Steam Turbines
    Trukhnii, A.D.
    Kalashnikov, A.A.
    Kostyuk, A.G.
    Troyanovskii, B.M.
    Styrikovich, M.A.
    Thermal Engineering, 1997, 44 (07): : 519 - 528