共 50 条
- [11] The construction of the Hamburg electricity works. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1905, 49 : 1509 - 1515
- [12] The construction of the Hamburg electricity works. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1905, 49 : 1462 - 1470
- [13] THE DESIGN AND CONSTRUCTION OF SPRINGFIELD SEWAGE-TREATMENT WORKS WATER POLLUTION CONTROL, 1983, 82 (01): : 37 - 41
- [15] DESIGN AND OPERATION OF VARIABLE-WIDTH CASTER MOLD AT GARY WORKS. Iron and Steel Engineer, 1986, 63 (04): : 40 - 42
- [16] CONSTRUCTION AND OPERATION OF A SUBMERGED AERATED FILTER SEWAGE-TREATMENT WORKS JOURNAL OF THE INSTITUTION OF WATER AND ENVIRONMENTAL MANAGEMENT, 1994, 8 (02): : 215 - 227
- [18] FUJI TOTAL MANAGEMENT SYSTEM FOR WATER AND SEWAGE WORKS. Fuji Electric Review, 1981, 27 (03): : 82 - 85
- [19] RATIONALIZATION OF SEWAGE-TREATMENT WORKS DESIGN-CONSTRUCTION EFFLUENT & WATER TREATMENT JOURNAL, 1978, 18 (09): : 442 - 444
- [20] THE DESIGN AND CONSTRUCTION OF MELTON SEWAGE-TREATMENT WORKS, AUSTRALIA WATER POLLUTION CONTROL, 1983, 82 (04): : 567 - 570