共 50 条
- [31] Geophysical Evaluation of Effectiveness of Blasting for Roof Caving During Longwall Mining of Coal Seam Pure and Applied Geophysics, 2020, 177 : 905 - 917
- [33] Applying top coal caving method to extract thick coal seam RESOURCES, ENVIRONMENT AND ENGINEERING, 2015, : 235 - 238
- [36] Study of Top Coal's Short Beam Layer Failure Mechanism of Sublevel Caving Mining Working Face in Extremely Thick Coal Seam PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL VII, PTS A AND B, 2008, 7 : 1621 - 1623
- [38] Segment pre-blasting application on 52 m sublevel caving of steep and thick coal seam under complex conditions ROCK STRESS AND EARTHQUAKES, 2010, : 355 - 359
- [39] Research on the Height of Caving Zone and Roof Classification of Mining Whole Height at One Times in Thick Coal Seam ARCHITECTURE AND BUILDING MATERIALS, PTS 1 AND 2, 2011, 99-100 : 207 - 212
- [40] Stability analysis of support around the longwall top-coal caving mining in steeply thick coal seam 2017, China Coal Society (42): : 2783 - 2791