LUDINGTON PUMPED STORAGE PROJECT.

被引:0
|
作者
Comninellis, Eustratios
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
A 1,872-Mw installed capacity. The upper reservoir with 53,000 acre-ft usable vessel is formed by a 6-mile long earth fill dam with a sandwich type asphalt facing. The six penstocks are encased in concrete, under the embankment, and buried in silty sand on the slope. At the intake structure the gates are suspended by hoists which allow for fast emergency closure. A prestressed, precast, concrete baffle wall serves as vortex suppressor and ice barrier. The powerhouse, constructed on clay, is protected by a breakwater and two jetties.
引用
收藏
页码:69 / 88
相关论文
共 50 条
  • [41] MINIPACK PROJECT.
    More, Jorge J.
    Sorensen, Danny C.
    Garbow, Burton S.
    Hillstrom, Kenneth E.
    1984, : 88 - 111
  • [42] HIGHMONT PROJECT.
    Anon
    Mining Magazine, 1981, 144 (01): : 18 - 29
  • [43] Map Project.
    Segarra, Gerard
    Revue generale de l'electricite Paris, 1987, (11): : 34 - 37
  • [44] MEGA PROJECT.
    Friedrich, Hans
    Siemens review, 1985, 52 (02): : 23 - 27
  • [45] The Authenticity Project.
    Kane, Julie
    LIBRARY JOURNAL, 2020, 145 (01) : 70 - 71
  • [46] The arcades project.
    Merrifield, A
    NATION, 2000, 270 (04) : 25 - 28
  • [47] The Laramie project.
    Miller, H
    LIBRARY JOURNAL, 2001, 126 (14) : 179 - 179
  • [48] ATESTO PROJECT.
    Hedebro, Bertil
    1974, 26 (02): : 1 - 9
  • [49] MUDDY RUN PUMPED STORAGE PROJECT - CASE HISTORY
    ROBBINS, TW
    MATHUR, D
    TRANSACTIONS OF THE AMERICAN FISHERIES SOCIETY, 1976, 105 (01) : 165 - 172
  • [50] FOYERS PUMPED STORAGE PROJECT - PLANNING, DESIGN AND CONSTRUCTION
    LANDER, JH
    JOHNSON, FG
    CRICHTON, JR
    BALDWIN, MW
    LAND, DD
    HITCHINGS, DC
    MILLER, DJ
    BAINES, JA
    ARGENT, GGR
    HARRIES, DA
    WATSON, A
    MURRAY, AR
    HANNAH, IW
    COWIE, JW
    WRIGHT, WP
    BINNIE, GM
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1978, 64 (NOV): : 591 - 602