Improvement of the Efficacy of Operation of the P-67 Boiler in an 800 MW Power Plant Unit.

被引:0
|
作者
Apatovskii, L.E.
Lipets, A.U.
Mochan, S.I.
Sotnikov, I.A.
Shvartsman, S.Ya.
Sheptun, V.I.
机构
来源
| 1600年
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
BOILERS
引用
收藏
相关论文
共 50 条
  • [1] Tests of a P-67 boiler for an 800 MW unit
    Vasilyev V.V.
    Borisov V.N.
    Petrov V.N.
    Kardachov A.S.
    Porozov S.V.
    Grebenkov P.Yu.
    Yanov S.R.
    Nazarov M.N.
    Maidanik M.N.
    Power Technology and Engineering, 2010, 44 (4) : 307 - 313
  • [2] Results from tests of the P-67 boiler used as part of a 800-MW power unit
    Greben'kov P.Y.
    Vasil'ev V.V.
    Borisov V.N.
    Petrov V.N.
    Kardashov A.S.
    Porozov S.V.
    Yanov S.R.
    Nazarov M.N.
    Maidanik M.N.
    Thermal Engineering, 2011, 58 (12) : 973 - 980
  • [3] Heat exchange investigation and modernization of furnace of P-67 boiler of 800 MW unit
    Bely V.V.
    Porozov S.V.
    Vasiliev V.V.
    Dekterev A.A.
    Tepfer E.S.
    Thermophysics and Aeromechanics, 2007, 14 (2) : 287 - 299
  • [4] Optimal Pulverized Fuel System for a Unitized Boiler in an 800 MW Unit.
    Parilov, V.A.
    Luzin, P.M.
    Dronov, Yu.D.
    1979, (04): : 37 - 39
  • [5] Development of the Design of a Boiler for a 500 MW Power Unit.
    Ovchar, V.G.
    Sotnikov, I.A.
    Aizen, Kh.K.
    Petrov, E.V.
    Teploenergetika, 1980, (05): : 34 - 38
  • [6] New Design of Gas and Residual Oil-Fired Boiler Unit for a 300 MW Power Plant Unit.
    Parshin, A.A.
    Levchenko, G.I.
    Khristich, L.M.
    Zaraiskii, S.I.
    Shleifer, B.M.
    Konashev, S.L.
    Energomashinostroenie, 1979, (01): : 14 - 17
  • [7] REDUCTION OF BOILER FEED PUMP NOISE IN AN 800 MW COAL-FIRED GENERATING UNIT.
    Thompson, A.R.
    Hoover, R.M.
    1978,
  • [8] Thermionic topping of the boiler of an 800 MW power-generating unit
    Berezinets, P.A.
    Kachalin, E.A.
    Thermal Engineering (English translation of Teploenergetika), 1988, 35 (11): : 636 - 639
  • [9] EVALUATION OF OPERATION OF OPVZ-185EG HEAD CIRCULATION PUMPS OF AN 800 MW POWER GENERATING UNIT.
    Rogovoi, T.N.
    Kikish, O.V.
    Soviet power engineering, 1981, 10 (05): : 725 - 734
  • [10] System of Optimization of the Burning Process for an 800 MW Power Unit Boiler.
    Gorelik, A.Kh.
    Duel', M.A.
    Rozenbaum, I.D.
    Solodovnikov, V.N.
    Teploenergetika, 1980, (05): : 50 - 54