共 50 条
- [3] Development of the Design of a Boiler for a 500 MW Power Unit. Teploenergetika, 1980, (05): : 34 - 38
- [4] Optimization of the Operation of a Pulverized Fuel System and Boiler of a 300 MW Power Unit According to Operating Regime Factors. Teploenergetika, 1976, (04): : 23 - 26
- [5] System of Optimization of the Burning Process for an 800 MW Power Unit Boiler. Teploenergetika, 1980, (05): : 50 - 54
- [7] Investigation of Fuel and Energy Losses in Starting an 800 Mw Single Unit with a TGMP-204 Boiler. Teploenergetika, 1981, (05): : 23 - 26
- [8] Thermionic topping of the boiler of an 800 MW power-generating unit Thermal Engineering (English translation of Teploenergetika), 1988, 35 (11): : 636 - 639
- [9] Explosion in a slag-tap pulverized fuel boiler at Leiningerwerk Unit 3 VGB-Kraftwerkstechnik, 1988, 68 (03): : 237 - 244