Heuristic algorithm for project scheduling with splitting allowed

被引:0
|
作者
Valls, Vicente [1 ]
Marti, Rafael [1 ]
Lino, Pilar [1 ]
机构
[1] Universidad de Valencia, Burjassot, Spain
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:87 / 104
相关论文
共 50 条
  • [41] Heuristic algorithm for fixed job scheduling problem
    Xu, Jie
    Sun, Hong
    Yang, Wei
    ICNC 2007: THIRD INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, VOL 5, PROCEEDINGS, 2007, : 698 - +
  • [42] Scheduling Model and Heuristic Algorithm for Roller Annealing
    Song, Jiwei
    Tang, Jiafu
    Luo, Xinggang
    Liu, Shu'an
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1052 - 1055
  • [43] A Heuristic Scheduling Algorithm for Computing of Power Grid
    Zhu, Youchan
    Guo, Xueying
    Chen, Yanyan
    2009 INTERNATIONAL CONFERENCE ON E-BUSINESS AND INFORMATION SYSTEM SECURITY, VOLS 1 AND 2, 2009, : 373 - +
  • [44] The dynamic scheduling algorithm based on heuristic rule
    Ge, Yan
    Wang, Aimin
    Cheng, Jincheng
    PROCEEDINGS OF THE 2016 INTERNATIONAL FORUM ON MANAGEMENT, EDUCATION AND INFORMATION TECHNOLOGY APPLICATION, 2016, 47 : 658 - 663
  • [45] A semi heuristic MINLP algorithm for production scheduling
    Yuceer, M
    Atasoy, I
    Berber, R
    EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING - 13, 2003, 14 : 335 - 340
  • [46] A Heuristic Algorithm for Weapon Target Assignment and Scheduling
    Uhm, Hyun Seop
    Lee, Young Hoon
    MILITARY OPERATIONS RESEARCH, 2019, 24 (04) : 53 - 62
  • [47] A Parallel Lagrangian-ACO Heuristic for Project Scheduling
    Brent, Oswyn
    Thiruvady, Dhananjay
    Gomez-Iglesias, Antonio
    Garcia-Flores, Rodolfo
    2014 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2014, : 2985 - 2991
  • [48] A heuristic algorithm for the job shop scheduling problem
    Yin, AH
    NETWORK AND PARALLEL COMPUTING, PROCEEDINGS, 2004, 3222 : 118 - 128
  • [49] A new heuristic algorithm for job shop scheduling
    Pan, YC
    Feng, YC
    ICIM' 2004: PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2004, : 191 - 196
  • [50] PROJECT SCHEDULING - EFFECTS OF PROBLEM STRUCTURE ON HEURISTIC PERFORMANCE
    PATTERSON, JH
    NAVAL RESEARCH LOGISTICS, 1976, 23 (01) : 95 - 123