共 50 条
- [31] STEEL AND CONCRETE BOX BEAMS USED IN SAME BRIDGE. Engineering and Contract Record, 1974, 87 (02): : 24 - 26
- [32] FATIGUE CRACKS AT END FLOOR BEAM CONNECTIONS OF STIFFENED ARCH BRIDGE. Technology Reports of the Osaka University, 1984, 34 (1741-1758): : 111 - 118
- [35] Rehabilitation and seismic upgrading of the masonry arch bridge over the Magra river in Villafranca XIV INTERNATIONAL CONFERENCE ON BUILDING PATHOLOGY AND CONSTRUCTIONS REPAIR, 2018, 11 : 371 - 378
- [39] LIMIT AND NON-LINEAR ANALYSIS OF A SLENDER ARCH BRIDGE. A COMPARATIVE STUDY PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON MECHANICS AND MATERIALS IN DESIGN (M2D2017), 2017, : 937 - 952
- [40] THE REPLACEMENT OF THE DECREPIT BRIDGE OVER KOPRIVNICA WITH 4TH NEW BRIDGE. GRADEVINAR, 2009, 61 (03): : 295 - 297