CAMPS: a constraint-based architecture for multiagent planning and scheduling

被引:0
|
作者
ETL , Ibaraki, Japan [1 ]
机构
来源
J Intell Manuf | / 2卷 / 147-154期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] A constraint-based method for project scheduling with time windows
    Cesta, A
    Oddi, A
    Smith, SF
    JOURNAL OF HEURISTICS, 2002, 8 (01) : 109 - 136
  • [42] A Constraint-Based Method for Project Scheduling with Time Windows
    Amedeo Cesta
    Angelo Oddi
    Stephen F. Smith
    Journal of Heuristics, 2002, 8 : 109 - 136
  • [43] Constraint-based job shop scheduling with ILOG SCHEDULER
    ILOG S.A., Gentilly, France
    J Heuristics, 4 (271-286):
  • [44] Constraint-Based Winner Determination for Auction-Based Scheduling
    Wang, Chun
    Ghenniwa, Hamada H.
    Shen, Weiming
    IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 2009, 39 (03): : 609 - 618
  • [45] Failure-Directed Search for Constraint-Based Scheduling
    Vilim, Petr
    Laborie, Philippe
    Shaw, Paul
    INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING, 2015, 9075 : 437 - 453
  • [46] Embedded System Verification Through Constraint-Based Scheduling
    El-Mahi, Olfat
    Nicolescu, Gabriela
    Pesant, Gilles
    Beltrame, Giovanni
    2012 IEEE INTERNATIONAL HIGH LEVEL DESIGN VALIDATION AND TEST WORKSHOP (HLDVT), 2012, : 92 - 95
  • [47] Constraint-based Test-scheduling of Embedded Microprocessors
    Bartzoudis, Nikolaos
    Tantsios, Vasileios
    McDonald-Maier, Klaus
    2008 ARGENTINE SCHOOL OF MICRO-NANOELECTRONICS, TECHNOLOGY AND APPLICATIONS, 2008, : 29 - +
  • [48] Constraint-Based Job and Resource scheduling in Grid Computing
    Soni, Vishnu Kant
    Sharma, Raksha
    Mishra, Manoj Kumar
    Das, Sarita
    ICCSIT 2010 - 3RD IEEE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY, VOL 4, 2010, : 334 - 337
  • [49] Constraint-based resource allocation and scheduling in steel manufacturing
    Carlsson, M
    Kreuger, P
    Åström, E
    PRACTICAL ASPECTS OF DECLARATIVE LANGUAGES, 1999, 1551 : 335 - 349
  • [50] A multiagent architecture for concurrent design, process planning, routing, and scheduling
    Balasubramanian, S
    Norrie, DH
    CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 1996, 4 (01): : 7 - 16