A knowledgeable simulated annealing scheme for the early/tardy flow shop scheduling problem

被引:0
|
作者
机构
[1] Zegordi, S.H.
[2] Itoh, K.
[3] Enkawa, T.
来源
Zegordi, S.H. | 1600年 / Taylor and Francis Ltd.卷 / 33期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] A Simulated Annealing Algorithm Based on Bottleneck Jobs for the Open Shop Scheduling Problem
    Zhang, Rui
    Wu, Cheng
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 4453 - 4457
  • [32] Minimizing Total Flow Time in Permutation Flow Shop Scheduling with Improved Simulated Annealing
    Chakraborty, Uday K.
    2009 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-5, 2009, : 158 - 165
  • [33] A simulated annealing algorithm for job shop scheduling
    Ponnambalam, SG
    Jawahar, N
    Aravindan, P
    PRODUCTION PLANNING & CONTROL, 1999, 10 (08) : 767 - 777
  • [34] Minimizing the Number of Tardy Jobs in Flow Shop Sequence Dependent Setup Times Scheduling Problem
    Varmazyar, Mohsen
    Salmasi, Nasser
    MECHANICAL AND AEROSPACE ENGINEERING, PTS 1-7, 2012, 110-116 : 4063 - 4069
  • [35] Application of particle swarm optimization and simulated annealing algorithms in flow shop scheduling problem under linear deterioration
    Bank, M.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Behnamian, J.
    ADVANCES IN ENGINEERING SOFTWARE, 2012, 47 (01) : 1 - 6
  • [36] MODIFIED SIMULATED ANNEALING ALGORITHMS FOR THE FLOW-SHOP SEQUENCING PROBLEM
    ISHIBUCHI, H
    MISAKI, S
    TANAKA, H
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (02) : 388 - 398
  • [37] Hypothesis-test based simulated annealing for stochastic flow shop scheduling
    Zhang, L
    Wang, L
    Tang, F
    2003 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-5, PROCEEDINGS, 2003, : 1607 - 1612
  • [38] Multi-objective flow shop scheduling using hybrid simulated annealing
    Dhingra, Ashwani
    Chandna, Pankaj
    MEASURING BUSINESS EXCELLENCE, 2010, 14 (03) : 30 - 41
  • [39] A simulated annealing for hybrid flow shop scheduling with multiprocessor tasks to minimize makespan
    Hui-Mei Wang
    Fuh-Der Chou
    Ful-Chiang Wu
    The International Journal of Advanced Manufacturing Technology, 2011, 53 : 761 - 776
  • [40] A simulated annealing for hybrid flow shop scheduling with multiprocessor tasks to minimize makespan
    Wang, Hui-Mei
    Chou, Fuh-Der
    Wu, Ful-Chiang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 53 (5-8): : 761 - 776