Construction control for engineering geologic body of underground power house chambers

被引:0
|
作者
Chen, Bingxinag
Hu, Chengqi
Liu, Xinying
机构
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Jiangya underground powerhouse has 33 chambers in different size. Due to the complicated chamber structure and stress state, as well as unfavourable geology structure, the construction is difficult. In order to guarantee the safety in construction and the stability of the chambers, according to the control theory of engineering geologic body, the systematic and comprehensive analysis on the rockmass in the whole construction zone and its environment was carried out and the purpose and means of construction control were determined. In the light of influence extent of the unfavorable geology on the different chambers, the different control ways were taken before, during and after excavation. To some important position, precontrol measures were taken, i.e. carrying out strengthening treatments before excavation. In the process of excavation, the related departments strengthened construction monitoring and feedback control to the whole engineering rockmass, optimized the design successively to guide the construction, guaranteed the safety in construction of the chambers at last.
引用
收藏
页码:44 / 45
相关论文
共 50 条
  • [31] THE DEEP UNDERGROUND SCIENCE AND ENGINEERING LABORATORY AND THE CONSTRUCTION OF PHYSICS MEGACAVERNS
    Laughton, C.
    2009 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 2009, : 638 - 645
  • [32] Development and application of information monitoring system for underground engineering construction
    Wu, Shenglin
    Deng, Hongliang
    Li, Changqing
    Ma, Libin
    Guo, Yang
    SIXTH INTERNATIONAL CONFERENCE ON ELECTRONICS AND INFORMATION ENGINEERING, 2015, 9794
  • [33] Engineering and geological aspects of underground railway construction and operation in CIS
    Roumiantseva, MN
    ENGINEERING GEOLOGY AND THE ENVIRONMENT, VOLS 1-3, 1997, : 2875 - 2877
  • [34] CONSTRUCTION ENGINEERING IN UNDERGROUND COAL-MINES - BRITTON,SG
    不详
    MINING ENGINEERING, 1983, 35 (08) : 1175 - 1175
  • [35] Automatic Monitoring System in Underground Engineering Construction: Review and Prospect
    Wang, Lixin
    Xu, Shuoshuo
    Qiu, Junling
    Wang, Ke
    Ma, Enlin
    Li, Chujun
    Guo, Chunxia
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [36] On the Complexity Category for Geologic-Engineering Conditions, and the Design and Installation of Foundation Beds and Underground Structures
    V. I. Krutov
    Soil Mechanics and Foundation Engineering, 2004, 41 (3) : 103 - 107
  • [37] ENGINEERING GEOLOGY OF CRUACHAN UNDERGROUND POWER-STATION
    KNILL, JL
    ENGINEERING GEOLOGY, 1972, 6 (04) : 289 - 312
  • [38] The Construction of House and Body Spaces in Modern Indonesian Poetry
    Vidiyanti, Made Oktavia
    Supratno, Haris
    Suhartono
    Tjahjono, Tengsoe
    PERTANIKA JOURNAL OF SOCIAL SCIENCE AND HUMANITIES, 2022, 30 (01): : 79 - 95
  • [39] Power Engineering Construction Technology and Management
    Li, Jianying
    2018 4TH INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT AND INFORMATION TECHNOLOGY (ICEMIT 2018), 2018, : 772 - 775
  • [40] CONSIDERATIONS FOR CONTROL OF HOUSE CONSTRUCTION IN COASTAL DUNES
    NORDSTROM, KF
    MCCLUSKEY, JM
    COASTAL ZONE MANAGEMENT JOURNAL, 1984, 12 (04): : 385 - 402