Facility status and results on ITER full-size conductor tests in SULTAN

被引:0
|
作者
EPFL, CRPP-FT, 5232 Villigen PSI, Switzerland [1 ]
机构
来源
IEEE Trans Appl Supercond | 1600年 / 1 II卷 / 2022-2025期
关键词
D O I
September 17, 2000 - September 22, 2000
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] The Effect of Specific Manufacturing Characteristics on PF ITER Full-Size Joint Performance
    Pison, Pilar Fernandez
    Langeslag, Stefanie A. E.
    Santillana, Ignacio Aviles
    Dimitrijevic, Alexander
    Sgobba, Stefano
    Ilyin, Yury
    Simon, Fabrice
    Lim, Byung Su
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2019, 29 (05)
  • [32] DISINFECTION OF DRINKING-WATER WITH UV-LIGHT RESULTS FROM FULL-SIZE TESTS
    WEDEKAMP, H
    SCHWAMMLEIN, K
    JOURNAL OF INFORMATION RECORDING MATERIALS, 1994, 21 (5-6): : 487 - 490
  • [33] Particle model of full-size ITER-relevant negative ion source
    Taccogna, F.
    Minelli, P.
    Ippolito, N.
    REVIEW OF SCIENTIFIC INSTRUMENTS, 2016, 87 (02):
  • [34] A FACILITY FOR PERFORMANCE EVALUATION OF FULL-SIZE CHARCOAL FILTERS IN REMOVING RADIOIODINE
    MINER, D
    FLETCHER, WD
    KITZES, AS
    TAYLOR, GR
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1967, S 10 : 1 - &
  • [35] FULL-SIZE TESTS ON LARGE PANEL SYSTEM BUILDINGS.
    Anon
    Concrete plant and production, 1986, 4 (03):
  • [36] BEHAVIOR OF HEADED STUDS IN COMPOSITE BEAMS - FULL-SIZE TESTS
    JAYAS, BS
    HOSAIN, MU
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1989, 16 (05) : 712 - 724
  • [37] TESTS OF FULL-SIZE COMPOSITE BEAMS WITH PERFOBOND RIB CONNECTORS
    OGUEJIOFOR, EC
    HOSAIN, MU
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1995, 22 (01) : 80 - 92
  • [38] Vibration tests on a full-size suspen-dome structure
    Maeda Corp
    International Journal of Space Structures, 1997, 12 (3-4): : 217 - 224
  • [39] The role of full-size and large size fatigue tests on structural fatigue problem
    Anami, K
    Miki, C
    INTERNATIONAL CONFERENCE ON FATIGUE OF WELDED COMPONENTS AND STRUCTURES, 1996, : 191 - 198
  • [40] As built design of the control systems of the ITER full-size beam source SPIDER in the neutral beam test facility- A critical review
    Luchetta, A.
    Taliercio, C.
    Cruz, N.
    Martini, G.
    Manduchi, G.
    Rigoni, A.
    Trevisan, L.
    Paolucci, F.
    Labate, C.
    Breda, M.
    Capobianco, R.
    Moressa, M.
    Molon, F.
    Sartore, A.
    Simionato, P.
    Zampiva, E.
    Barbato, P.
    Carraro, M.
    Migliorato, L.
    FUSION ENGINEERING AND DESIGN, 2023, 191