Construction of the land footing and structure began in April, 1985. Work in the water was regulated by a Department of Ecology 'fish window' that restricted pile driving to periods between July 15 and November 1. The bridge abutments and land piers were constructed on either spread footings or WSDOT standard 80-ton (72-Mg) bearing piles. The contractor elected to use the steel pile alternate. The 14-inch (35.5 cm) diameter pipe piles were driven into prebored holes, then filled with concrete. When the foundation work was complete, the land based construction of columns and retaining walls proceeded.
引用
收藏
页码:42 / 46
相关论文
共 50 条
  • [1] Floating bridge approach span construction
    McCoy, Charlie
    Concrete International: Design and Construction, 1989, 11 (02): : 42 - 46
  • [2] Bridge awards span construction, design options
    不详
    CIVIL ENGINEERING, 1997, 67 (04): : 11 - 11
  • [3] Floating Bridge Construction Using Waterfront Methods
    Lighty, Trevor A.
    Oates, Don L.
    Bowman, David
    Hoff, Andy
    Ports 2016: Port Planning and Development, 2016, : 883 - 892
  • [5] Construction of Yumemai bridge - A floating swing arch bridge in Osaka, Japan
    Watanabe, Eiichi
    Ueda, Shigeru
    Maruyama, Tadaaki
    Takeda, Sumio
    Stahlbau, 2003, 72 (05) : 323 - 330
  • [6] Construction control analysis of long span suspension bridge
    Gongku jiaotong Keji/Journal of Highway and Transportation Research and Development, 1994, 11 (01):
  • [7] On the design and construction of pylon of long span suspension bridge
    Yang, Yun
    Gonglu Jiaotong Keji/Journal of Highway and Transportation Research and Development, 1994, 11 (03): : 11 - 16
  • [8] Rapid hardening concrete for the construction of a small span bridge
    Cangiano, Stefano
    Meda, Alberto
    Plizzari, Giovanni A.
    CONSTRUCTION AND BUILDING MATERIALS, 2009, 23 (03) : 1329 - 1337
  • [9] Engineering the Tower and Main Span Construction of Stonecutters Bridge
    Morgenthal, Guido
    Sham, Robin
    West, Brian
    JOURNAL OF BRIDGE ENGINEERING, 2010, 15 (02) : 144 - 152
  • [10] SALVAGE OF HEAVY CONSTRUCTION EQUIPMENT BY A FLOATING ICE BRIDGE
    KIVISILD, HR
    ROSE, GD
    MASTERSON, DM
    CANADIAN GEOTECHNICAL JOURNAL, 1975, 12 (01) : 58 - 69