共 50 条
- [31] Heuristic Difference Algorithm for Scheduling Flowshop with Limited Storage in Chemical Industry PROCEEDINGS OF 2016 9TH INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN (ISCID), VOL 2, 2016, : 13 - 16
- [36] Optimization method for highway project scheduling under limited resources condition Chang'an Daxue Xuebao (Ziran Kexue Ban)/Journal of Chang'an University (Natural Science Edition), 2007, 27 (03): : 42 - 46
- [37] Heuristic algorithm for flexible resource-constrained project scheduling problem Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1846 - 1855
- [38] A Novel Heuristic Algorithm for Spatial Resource Constrained Project Scheduling Problem INFORMATION TECHNOLOGY FOR MANUFACTURING SYSTEMS II, PTS 1-3, 2011, 58-60 : 1448 - 1453
- [40] A heuristic scheduling algorithm for improving the duration and net present value of a project International Journal of Operations & Production Management, 15 (01):