JCT With Contractor's Design form of contract: a study in use

被引:0
|
作者
Pain, James [1 ]
Bennett, John [2 ]
机构
[1] BCP Project Management, 20–24 Vachel Road, Reading,RG1 1PG, United Kingdom
[2] Department of Construction Management, University of Reading, Whiteknights,Reading,RG6 2BU, United Kingdom
关键词
D O I
10.1080/01446198800000026
中图分类号
学科分类号
摘要
引用
收藏
页码:307 / 337
相关论文
共 50 条
  • [31] A Comparison between China's Standard Form of Construction Contract and FIDIC Conditions of Contract for Construction on Risk allocations
    Huang Nan
    Xu Wei
    Shen Jie
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 2155 - 2160
  • [32] Identification of design-build project risk factors: contractor's perspective
    Rostiyanti, Susy
    Koesalamwardi, Ario Bintang
    Winata, Christian
    INTERNATIONAL CONFERENCE ON ADVANCES IN CIVIL AND ENVIRONMENTAL ENGINEERING (ICANCEE 2018), 2019, 276
  • [33] Contractor's redesign of construction methods and procedures for New York City Transit Authority contract C-20201
    Grand, BA
    Almeraris, GA
    1999 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1999, : 199 - 217
  • [34] Benefits of the NEC ECC form of contract: A New Zealand case study
    Wright, J. Nevan
    Fergusson, Warwick
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (03) : 243 - 249
  • [35] Effect of Level of Owner-Provided Design on Contractor's Design Quality in DB/EPC Projects
    Zhang, Shuibo
    Liu, Xinyan
    Gao, Ying
    Ma, Pei
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (01)
  • [36] Images of contract - An empirical study of the use of theory in practice
    Fargion, S
    BRITISH JOURNAL OF SOCIAL WORK, 2003, 33 (04): : 517 - 533
  • [37] The Feasibility Study's Rules on Contract Interpretation
    Hardy, Robert
    EUROPEAN REVIEW OF PRIVATE LAW, 2011, 19 (06): : 817 - 833
  • [38] RETRACTED: Research on the optimal incentive contract considering contractor's intrinsic motivation in the construction quality insurance system (Retracted Article)
    Chen, Xing-Hai
    Ding, Lie-Yun
    Luo, Han-Bin
    Sun, Jun
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2008, : 707 - +
  • [39] LET'S TALK: HOW COMMUNICATION AFFECTS CONTRACT DESIGN
    Brandts, Jordi
    Ellman, Matthew
    Charness, Gary
    JOURNAL OF THE EUROPEAN ECONOMIC ASSOCIATION, 2016, 14 (04) : 943 - 974
  • [40] Option Contract Design and Risk Analysis: Supplier's Perspective
    Feng, Yi
    Wu, Qing
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2018, 35 (03)