共 50 条
- [21] RESEARCH AND DESIGN ON INTERNAL TURRET MOORING SYSTEM OF FPSO IN SOUTH CHINA SEA 33rd International Conference on Ocean, Offshore and Arctic Engineering, 2014, Vol 1A, 2014,
- [22] LARGEST, 'FASTEST' POWDER COATING SYSTEM. Industrial finishing Wheaton, 1984, 60 (05): : 43 - 44
- [23] EXXON COMPLETES WIRELINE DRILLING DATA TELEMETRY SYSTEM. Oil and Gas Journal, 1980, 78 (15): : 137 - 148
- [28] Transco completes Scotland's largest gas main replacement Pipe Line & Gas Industry, 2000, 83 (03):
- [30] BER performance of the hybrid FSO/RF attenuation system. 2006 7TH INTERNATIONAL SYMPOSIUM ON ANTENNAS, PROPAGATION AND EM THEORY, VOLS 1 AND 2, PROCEEDINGS, 2006, : 628 - 631