FAILURE OF A CAST-IN-PLACE UNREINFORCED CONCRETE CONDUIT.

被引:0
|
作者
Chang, Jerry C.
机构
关键词
CONCRETE CONSTRUCTION - Failure - ROADS AND STREETS - Embankments;
D O I
暂无
中图分类号
学科分类号
摘要
A case history of the failure of a cast-in-place, unreinforced concrete conduit constructed near the toe of a highway embankment is described. Theoretical analysis was conducted to predict the behavior of the conduit. It was concluded that the conduit had failed primarily because of the additional lateral load exerted by an embankment. The effectiveness of the theoretical analysis was demonstrated by using actual conduit failure.
引用
收藏
页码:25 / 34
相关论文
共 50 条
  • [21] On several principal problems in bored cast-in-place concrete piles
    Zhao, Wen-Yi
    Zheng, Jun-Jie
    Lu, Yan-Er
    Luo, Jun-Jun
    GEO-CHANGSHA 2007: AN INTERNATIONAL CONFERENCE ON GEOTECHNICAL ENGINEERING, PROCEEDINGS, 2007, : 475 - 480
  • [22] CAST-IN-PLACE CONCRETE SLOTTED FLOORS FOR LIVESTOCK FEEDING HOUSES
    不详
    CONCRETE CONSTRUCTION, 1983, 28 (03): : 235 - &
  • [23] Field study of plastic tube cast-in-place concrete pile
    Yong-hui Chen
    De-hong Cao
    Xin-quan Wang
    Hai-wei Du
    Ting Zhang
    Journal of Central South University of Technology, 2008, 15 : 195 - 202
  • [24] Investigation of alternative technologies for cast-in-place concrete bridge decks
    Yost, Joseph Robert
    Dinehart, David W.
    Gross, Shawn P.
    Mignella, Michael
    Rapone, Christopher
    BRIDGE STRUCTURES, 2014, 10 (01) : 19 - 32
  • [25] Design and construction of boring cast-in-place concrete pile in area
    Xia, Lin
    Li, Zhirong
    Wuhan Gongye Daxue Xuebao/Journal of Wuhan University of Technology, 2000, 22 (01): : 41 - 43
  • [26] Experience in the design and construction of cast-in-place concrete-shafts
    Finckh, W.
    Kipp, S.
    BAUINGENIEUR, 2014, 89 : 11 - 19
  • [27] Durability of Wet Bond of Hybrid Laminates to Cast-in-Place Concrete
    Li, Li
    Shao, Yixin
    Wu, Zhishen
    JOURNAL OF COMPOSITES FOR CONSTRUCTION, 2010, 14 (02) : 209 - 216
  • [28] Concrete breakout capacity of cast-in-place concrete anchors in early-age concrete
    Winters, James B.
    Dolan, Charles W.
    PCI JOURNAL, 2014, : 114 - 131
  • [29] The influence of the bonding length on the failure mechanism of the interface between the TRC permanent formwork and cast-in-place concrete
    Li, Shi-chang
    Yin, Shi-ping
    STRUCTURES, 2021, 29 : 1690 - 1698
  • [30] Fabric-Lined Tensile Formwork for Cast-in-Place Concrete Walls
    Palagi K.
    Technology Architecture and Design, 2020, 4 (01): : 56 - 67