Stability and reinforcement of upright slop of the TGP permanent shiplocks

被引:0
|
作者
Chen, Lei [1 ]
Zhang, Chuanjian [1 ]
Song, Zhizhong [1 ]
机构
[1] Bureau of TGP, Changjiang Water Resources Commn., Yichang 443002, China
关键词
Crack initiation - Geological surveys - Rock mechanics - Slope stability;
D O I
暂无
中图分类号
学科分类号
摘要
The TGP permanent shiplock was dug and built in hill. The height of shiplock slope is 50∼70 m and the unitary stability of the slope is quite good. But the problem is very serious which resulted from a mass of random wedges composed of cracks, to affect partial stability and safety of slope. After careful geological research in site, according to the principle of dynamic design, the stability and safety of the slope are insured after all wedges were checked and reinforced.
引用
收藏
页码:643 / 647
相关论文
共 50 条
  • [21] Study on Stability of Rock at Reservoir Banks Slop Based on AHP
    Zhou Zhi-jun
    Liang Han
    Wang Xiao-dong
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 2309 - 2317
  • [22] Influence parameter sensitivity of underground mining on rock slop stability
    Xu, Hong
    Yao, Guang-Hua
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2013, 30 (04): : 573 - 577
  • [23] Displacement monitoring and deformation characteristic analysis for permanent lock high slopes of TGP
    Zhu, Hongwu
    Ma, Shuishan
    Li, Duanyou
    Changjiang Kexueyuan Yuanbao/ Journal of Yangtze River Scientific Research Institute, 1998, 15 (06): : 23 - 26
  • [24] Development and decline of upright gait stability
    Iosa, Marco
    Fusco, Augusto
    Morone, Giovanni
    Paolucci, Stefano
    FRONTIERS IN AGING NEUROSCIENCE, 2014, 6
  • [25] Artificial Neural Network's Application in Intelligent Slop Stability Analysis
    Chen Haiming
    Zhou Shengquan
    Yu Jun
    Chen Haiming
    Yu Jun
    ICICTA: 2009 SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL I, PROCEEDINGS, 2009, : 306 - 309
  • [26] Equivalence surface method based on extensive angle analysis for slop stability
    Lin, Peng
    Zhuo, Jiashou
    Shuili Xuebao/Journal of Hydraulic Engineering, 2000, (08): : 75 - 79
  • [27] Liquefaction of sands in TGP cofferdam and its dynamic stability in earthquake
    Changjiang Kexueyuan Yuanbao/ Journal of Yangtze River Scientific Research Institute, 1998, 15 (01): : 39 - 43
  • [28] Deformation Monitoring and Result Analysis on the High Excavated Slopes of TGP's Permanent Shiplock
    PEI Zhuo-yanSenior Engineer
    人民长江, 2002, (S1) : 13 - 17
  • [29] Elastic-brittle-plastic theory and numerical simulation of excavation for permanent lock of TGP
    Ren, Fang
    Sheng, Qian
    Changjiang Kexueyuan Yuanbao/ Journal of Yangtze River Scientific Research Institute, 16 (04): : 6 - 8
  • [30] Solution on equivalent permeability of rock mass during excavation - taking the slope of permanent shiplocks in the Three Gorges Project as an example
    Chongqing Univ of Communications, Chongqing, China
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 1999, 18 (02): : 129 - 132