共 50 条
- [31] Preliminary Discussion on the Management of Construction Contracts PROCEEDINGS OF THE 2015 ASIA-PACIFIC ENERGY EQUIPMENT ENGINEERING RESEARCH CONFERENCE (AP3ER 2015), 2015, 9 : 496 - 499
- [32] Factors influencing decisions on delay claims in construction contracts for Indian scenario CONSTRUCTION ECONOMICS AND BUILDING, 2014, 14 (01): : 32 - 44
- [33] DOCUMENT MANAGEMENT FOR CONSTRUCTION CLAIMS PREVENTION 33RD ANNUAL MEETING OF THE AMERICAN ASSOCIATION OF COST ENGINEERS, 1989, : 283 - 286
- [34] Adverse environmental impact: A consultant's perspective DEFINING AND ASSESSING ADVERSE ENVIRONMENTAL IMPACT FROM POWER PLANT IMPINGEMENT AND ENTRAINMENT OF AQUATIC ORGANISMS, 2003, : 185 - 197
- [36] Substation horror story A consultant's perspective 2008 61ST ANNUAL CONFERENCE FOR PROTECTIVE RELAY ENGINEERS, VOLS 1 AND 2, 2008, : 377 - +
- [37] Research Skills for the Future: A Consultant's Perspective JOURNAL OF RESEARCH PRACTICE, 2013, 9 (01):
- [38] INFORMATION-SYSTEM FOR CONSTRUCTION CONTRACTS AND MANAGEMENT MANAGING CONSTRUCTION WORLDWIDE, VOL 1: SYSTEMS FOR MANAGING CONSTRUCTION, 1987, : 408 - 414
- [40] Success Factors of the Consultant Selection Stage of the Ghanaian Public Construction Projects: The Road Sector's Perspective CONSTRUCTION ECONOMICS AND BUILDING, 2024, 24 (1-2): : 144 - 162