RUBBER RAILROAD CROSSING BUILT LIKE A POST-TENSIONED SUSPENSION BRIDGE.

被引:0
|
作者
Anon
机构
来源
Better Roads | 1980年 / 50卷 / 03期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
RAILROAD PLANT AND STRUCTURES
引用
收藏
页码:24 / 25
相关论文
共 50 条
  • [22] Instrumentation and Full-Scale Test of a Post-Tensioned Concrete Bridge
    Bagge, Niklas
    Nilimaa, Jonny
    Blanksvard, Thomas
    Elfgren, Lennart
    NORDIC CONCRETE RESEARCH, 2014, 51 (03): : 63 - 83
  • [23] Application of risk analysis for the preservation of post-tensioned girder bridge decks
    Cremona, C.
    Lacoste, G.
    Corfdir, P.
    Neiers, S.
    Aubagnac, C.
    Delahaye, E.
    Marcotte, C.
    Paillusseau, P.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 2885 - 2892
  • [24] Cost-effective post-tensioned bridge pier with internal dissipation
    Piras S.
    Palermo A.
    Resilient Cities and Structures, 2022, 1 (01): : 33 - 43
  • [25] Reliability analysis of a post-tensioned bridge using NLFEA and random fields
    Diaz, R. Sanabria
    Nova, S. Sarmiento
    Trautwein, L. Mouta
    de Almeida, L. C.
    Texeira da Silva, M. C. A.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, LIFE-CYCLE SUSTAINABILITY AND INNOVATIONS, 2021, : 3747 - 3754
  • [26] RAILWAY BRIDGE USING SMALL POST-TENSIONED CONCRETE BOX GIRDER
    Rhee, Inkyu
    BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2012, 7 (02): : 137 - 144
  • [27] Improving seismic performance of segmental precast post-tensioned bridge piers
    Amini, Mehrshad
    Mirtaheri, Masoud
    Zandi, Amir Peyman
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-STRUCTURES AND BUILDINGS, 2017, 170 (12) : 928 - 938
  • [28] Influence of Cracking on Effects of Restrained Deformations in a Post-tensioned Concrete Bridge
    Jalonen, Kimmo
    Tulonen, Joonas
    Laaksonen, Anssi
    NORDIC CONCRETE RESEARCH, 2018, 59 (02): : 95 - 110
  • [29] 9 m glass bridge with post-tensioned reinforcement at glasstec 2014
    Weller, Bernhard
    Engelmann, Michael
    Stahlbau, 2015, 84 (S1) : 455 - 464
  • [30] Durability study of a 35-year-old post-tensioned bridge
    Schupack, Morris
    Concrete International, 1994, 16 (02) : 54 - 58