共 50 条
- [22] Dynamic modeling of a nuclear gas turbine plant. Application to surge prediction PROCEEDINGS OF THE ASME TURBO EXPO 2006, VOL 4, 2006, : 23 - 32
- [23] USE OF A HYBRID COMPUTER IN OPTIMIZATION OF GAS-TURBINE CONTROL PARAMETERS JOURNAL OF ENGINEERING FOR POWER-TRANSACTIONS OF THE ASME, 1973, 95 (03): : 257 - 264
- [24] Control Computer for Preparing Blast Furnace Burden at Vitkovice Plant. Hutnicke listy, 1984, 39 (02): : 76 - 86
- [25] Improvement of Operating Indices of GT-25 Gas Turbine Power Plant. Teploenergetika, 1979, (11): : 34 - 37
- [27] District Heating of Tor di Valle (Rome) with a Gas Turbine Cogeneration Plant. Termotecnica Milano, 1982, 36 (11): : 63 - 67
- [28] Determination of Startup Conditions of GT-100 Gas Turbine Power Plant. Teploenergetika, 1980, (03): : 32 - 38
- [29] CONTROL SYSTEMS FOR THE FLOTATION AGENTS OF A COAL CLEANING PLANT. Coal Science and Technology (Peking), 1983, (02): : 31 - 34
- [30] USE OF A HYBRID COMPUTER IN OPTIMIZATION OF GAS-TURBINE CONTROL PARAMETERS - DISCUSSION JOURNAL OF ENGINEERING FOR POWER-TRANSACTIONS OF THE ASME, 1974, 96 (03): : 324 - 325