Production of seamless tube

被引:0
|
作者
机构
来源
| 1600年 / Iron & Steel Inst of Japan, Tokyo, Japan卷 / 81期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] Osmotic regulation of seamless tube growth
    Schottenfeld-Roames, Jodi
    Ghabrial, Amin S.
    NATURE CELL BIOLOGY, 2013, 15 (02) : 137 - 139
  • [22] Dimensional control of seamless tube tooling
    Presto, JA
    37TH MECHANICAL WORKING AND STEEL PROCESSING CONFERENCE PROCEEDINGS, 1996, 33 : 539 - 541
  • [23] Modeling and Control for the Tube Blank Heating Quality of Seamless Tube
    Xiao, Dong
    Shi, Shaohua
    Mao, Zhizhong
    Wang, Jichun
    2013 9TH ASIAN CONTROL CONFERENCE (ASCC), 2013,
  • [24] PRODUCTION OF SEAMLESS TUBES
    OBEREM, K
    STAHL UND EISEN, 1984, 104 (25-2): : 1339 - 1343
  • [25] A case of rule-based heuristics for scheduling hot rolling seamless steel tube production
    Li, Jianxiang
    Li, Ling
    Tang, Lixin
    Wu, Huijiang
    EXPERT SYSTEMS, 2006, 23 (03) : 145 - 158
  • [26] Optimal and near-optimal algorithms to rolling batch scheduling for seamless steel tube production
    Tang, Lixin
    Huang, Lin
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 105 (02) : 357 - 371
  • [27] PRODUCTION OF SEAMLESS TUBES FROM CONTINUOUSLY-CAST METAL ON AUTOMATIC TUBE ROLLING MILLS
    LIFSHITS, AS
    PLYATSKO.OA
    RUTKOVSK.VB
    DRUZHINI.VP
    STAL IN ENGLISH-USSR, 1968, (11): : 967 - &
  • [28] ELECTRICAL DRIVES FOR A CONTINUOUS SEAMLESS TUBE MILL
    不详
    ELECTRICAL REVIEW, 1970, 186 (08): : 281 - &
  • [29] DIRECT QUENCHING PROCESS IN SEAMLESS TUBE MANUFACTURING
    MIHARA, Y
    UENO, Y
    KAMIO, H
    HATANAKA, M
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (08): : 965 - 971
  • [30] Parameters of cold pilgering of seamless steel tube
    Chu, Zhi-bing
    Xue, Zhan-yuan
    Zhang, Duo
    Wang, Huan-zhu
    Li, Wei
    Liu, Ren-huai
    Huang, Qing-xue
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2019, 26 (06) : 593 - 601