Determination of the Reasonable Rate of Lifting Underground Equipment.

被引:0
|
作者
Gurbanov, R.S.
Abbasov, E.M.
Abbasov, A.A.
机构
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业];
学科分类号
0820 ;
摘要
The state of stress and strain of a drill pipe column with a heavy bottom following a start with the speed of V//0 is considered. A formula is obtained for the determination of stresses in transverse sections of pump and compressor pipes, from which it follows that these stresses depend on geometric dimensions of the sections and the rate of lifting of underground equipment. However, with an increase of the rate of lifting, the values of these stresses increase as well.
引用
收藏
页码:29 / 33
相关论文
共 50 条
  • [21] SOLVENT EXTRACTION EQUIPMENT.
    Godfrey, James C.
    Slater, Michael J.
    Chemistry and Industry (London), 1978, (19): : 745 - 748
  • [22] Equipment. Volvo redesigns
    Waste Age, 1994, 25 (02):
  • [23] RESPIRATORY PROTECTIVE EQUIPMENT.
    Anon
    National safety news, 1979, 120 (02): : 83 - 90
  • [24] REDESIGNING CRANE EQUIPMENT.
    Rekhtin, A.E.
    Soviet Energy Technology (English translation of Energomashinostroenie), 1985, (08): : 17 - 19
  • [25] INVENTIONS AND NEW EQUIPMENT.
    Sharutin, V.N.
    Varshavskii, A.A.
    Soviet Energy Technology (English translation of Energomashinostroenie), 1984, (04): : 72 - 78
  • [26] MODERNIZATION OF SURVEY EQUIPMENT.
    Wilcox, Douglas J.
    1978, 38 (04): : 323 - 327
  • [27] American foundry equipment.
    Lohse, U
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1912, 56 : 1525 - 1531
  • [28] SUPERVISORY AND CONTROL EQUIPMENT.
    Sado, Takatoshi
    Narieda, Masahide
    Nagayama, Hiroaki
    Miyazaki, Yoichi
    NEC Research and Development, 1980, 57 : 99 - 108
  • [29] PROCESS WEIGHING EQUIPMENT.
    Anon
    Bulk Solids Handling, 1988, 8 (01):
  • [30] EARTHMOVING AND HEAVY EQUIPMENT.
    Key, Jeffrey M.
    Journal of Construction Engineering and Management, 1987, 113 (04) : 611 - 622