共 50 条
- [11] New installation for ultrasonic inspection in a plate rolling mill MATERIALPRUFUNG, 2000, 42 (04): : 118 - 118
- [13] Design modifications for the new economiser installation at Invicta Mill INTERNATIONAL SUGAR JOURNAL, 2015, 117 (1402): : 726 - 730
- [14] INSTALLATION OF NEW REHEATING FURNACES FOR WIRE ROD MILL TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1993, 79 (11): : T172 - T175
- [16] Installation loads on new pipelines during pipe bursting UNDERGROUND INFRASTRUCTURE RESEARCH: MUNICIPAL, INDUSTRIAL AND ENVIRONMENTAL APPLICATIONS, 2001, : 89 - 93
- [18] Review of the installation of a new set of cooling towers at Farleigh mill INTERNATIONAL SUGAR JOURNAL, 2015, 117 (1404): : 872 - 876
- [20] Development of new UST inspection for UOE pipe mill PROCEEDINGS OF THE SEVENTEENTH (2007) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 1- 4, PROCEEDINGS, 2007, : 3041 - +