New pipe joining technology shortens installation at Ponderosa fibres mill

被引:0
|
作者
Monper, Mark [1 ]
机构
[1] Victaulic Co of America, Easton, United States
来源
Pulp and Paper | 1997年 / 71卷 / 09期
关键词
Deinking - Maintenance - Materials handling - Pipe fittings - Piping systems - Seals - Stainless steel - Water supply;
D O I
暂无
中图分类号
学科分类号
摘要
Owned jointly by Ponderosa Fibers of America (75%) and Appleton Papers (25%), the $192 million, 125,000 ft2 Northampton facility converts 600 tpd of office waste into more than 400 tons of pulp for the manufacture of copy paper, carbonless business forms and coated papers. The Northampton mill contains 80,000 ft of piping to handle the millions of gallons of water required for the deinking process. This includes 40,000 feet of 2 1/2 in. to 30 in. stainless steel process piping to service the batch pulpers, cleaners, washers, flotation tanks, bleaching units, and presses. Another 30,000 ft of small-diameter stainless piping supplies pump seal water, filtrate water, washdown stations, service water and compressed air for control instrumentation.
引用
收藏
页码:121 / 122
相关论文
共 50 条
  • [11] New installation for ultrasonic inspection in a plate rolling mill
    不详
    MATERIALPRUFUNG, 2000, 42 (04): : 118 - 118
  • [12] Installation of Reycan's new light gauge mill
    Aluminium Today, 2000, 12 (02):
  • [13] Design modifications for the new economiser installation at Invicta Mill
    Burns, D.
    O'Malley, G.
    INTERNATIONAL SUGAR JOURNAL, 2015, 117 (1402): : 726 - 730
  • [14] INSTALLATION OF NEW REHEATING FURNACES FOR WIRE ROD MILL
    YAMAGATA, K
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1993, 79 (11): : T172 - T175
  • [16] Installation loads on new pipelines during pipe bursting
    Fernando, V
    Moore, ID
    UNDERGROUND INFRASTRUCTURE RESEARCH: MUNICIPAL, INDUSTRIAL AND ENVIRONMENTAL APPLICATIONS, 2001, : 89 - 93
  • [17] NEW PIPE MAY CUT INSTALLATION COSTS.
    Fisher, William
    Water and Wastes Engineering, 1975, 12 (06):
  • [18] Review of the installation of a new set of cooling towers at Farleigh mill
    Lavarack, Bryan
    Stevenson, Bruce
    Rasmussen, Robert
    INTERNATIONAL SUGAR JOURNAL, 2015, 117 (1404): : 872 - 876
  • [19] New Concept of Pipe Rolling Unit with a Continuous Mill
    Pumpyanskii D.A.
    Vydrin A.V.
    Barichko B.V.
    Yakovleva K.Y.
    Steel in Translation, 2022, 52 (06) : 615 - 618
  • [20] Development of new UST inspection for UOE pipe mill
    Nagase, M.
    Hirose, Y.
    Horikiri, T.
    Ohkubo, H.
    Yamano, M.
    PROCEEDINGS OF THE SEVENTEENTH (2007) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 1- 4, PROCEEDINGS, 2007, : 3041 - +