4 Estimating Risk Adjusted Cost or Schedule Using Fuzzy Logic

被引:0
|
作者
Bellagamba, Laurence [1 ]
机构
[1] Space & Laser Programs Division, Space and Electronics Group, TRW One Space Park, Redondo Beach,CA,90278, United States
来源
INCOSE International Symposium | 1999年 / 9卷 / 01期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:241 / 246
相关论文
共 50 条
  • [31] Using fuzzy logic in low cost microcontroller to increase accelerometer performances
    Gaysse, K
    SMCia/05: Proceedings of the 2005 IEEE Mid-Summer Workshop on Soft Computing in Industrial Applications, 2005, : 6 - 11
  • [32] Optimal Irrigation Planning with Minimization of Cost of Cultivation Using Fuzzy Logic
    Regulwar, Dattatray. G.
    Gurav, Jyotiba B.
    PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS III AND IV, 2013,
  • [33] Comprehensive identification of multiple harmonic sources using fuzzy logic and adjusted probabilistic neural network
    Moradifar, Amir
    Foroud, Asghar Akbari
    Firouzjah, Khalil Gorgani
    NEURAL COMPUTING & APPLICATIONS, 2019, 31 (Suppl 1): : 543 - 556
  • [34] Comprehensive identification of multiple harmonic sources using fuzzy logic and adjusted probabilistic neural network
    Amir Moradifar
    Asghar Akbari Foroud
    Khalil Gorgani Firouzjah
    Neural Computing and Applications, 2019, 31 : 543 - 556
  • [35] Fuzzy numbers in cost range estimating
    Shaheen, Ahmed A.
    Fayek, Aminah Robinson
    AbouRizk, S. M.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (04) : 325 - 334
  • [36] A Fuzzy Logic Model for Predicting the Development Schedule of Software Projects
    Lopez-Martin, Cuauhtemoc
    Chavoya, Arturo
    Elena Meda-Campana, Maria
    2015 12TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY - NEW GENERATIONS, 2015, : 415 - 420
  • [37] Fuzzy logic approach for activity delay analysis and schedule updating
    Oliveros, AVO
    Fayek, AR
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (01): : 42 - 51
  • [38] Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach
    Abu El-Maaty, Ahmed Ebrahim
    El-Kholy, Amr M.
    Akal, Ahmed Yousry
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (05) : 809 - 827
  • [39] Risk evaluation in Colombian electricity market using fuzzy logic
    Medina, Santiago
    Moreno, Julian
    ENERGY ECONOMICS, 2007, 29 (05) : 999 - 1009
  • [40] Obsolescence Risk Optimization Using Fuzzy Logic and Genetic Algorithm
    Esfahani, Amir Kouhpayehzadeh
    Darbeheshty, Behzad
    Esfahani, Sedigheh Kouhpayehzadeh
    Niknafs, Ali Akbar
    2013 FOURTH INTERNATIONAL CONFERENCE ON COMPUTING, COMMUNICATIONS AND NETWORKING TECHNOLOGIES (ICCCNT), 2013,