- [22] Bi-objective resource constrained project scheduling problem with makespan and net present value criteria: two meta-heuristic algorithms INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (1-4): : 617 - 626
- [23] Bi-objective resource constrained project scheduling problem with makespan and net present value criteria: two meta-heuristic algorithms The International Journal of Advanced Manufacturing Technology, 2013, 69 : 617 - 626
- [24] A HEURISTIC METHOD FOR THE ESTIMATION OF THE PROJECT DURATION IN A STOCHASTIC NETWORK SCHEDULING RAIRO-RECHERCHE OPERATIONNELLE-OPERATIONS RESEARCH, 1995, 29 (03): : 285 - 298
- [25] Metaheuristics for some Discrete-Continuous Project Scheduling Problems to Maximize the Net Present Value 2017 22ND INTERNATIONAL CONFERENCE ON METHODS AND MODELS IN AUTOMATION AND ROBOTICS (MMAR), 2017, : 471 - 476
- [26] HEURISTIC ALGORITHM FOR PROJECT SCHEDULING WITH LIMITED RESOURCES. Journal of the Institution of Engineers (India): Mechanical Engineering Division, 1984, 65 : 6 - 9
- [30] Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources INTERNATIONAL JOURNAL OF ENGINEERING, 2018, 31 (05): : 780 - 791