Chemical steam generator cleaning at Unterweser Nuclear Power Plant

被引:0
|
作者
Kostroun, F.
Kuhnke, K.
Hollwedel, Ursula
机构
来源
VGB Kraftwerkstechnik | 1995年 / 75卷 / 09期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] Mathematical model of steam generator feed system at power unit of nuclear plant
    E. M. Raskin
    L. A. Denisova
    V. P. Sinitsyn
    Yu. V. Nesterov
    Automation and Remote Control, 2011, 72 : 1118 - 1126
  • [32] Corrosion test of plugging procedure for steam generator of Qinshan Nuclear Power Plant
    Xue, Renyong
    Tian, Baiyuan
    Hedongli Gongcheng/Nuclear Power Engineering, 1993, 14 (04): : 340 - 343
  • [33] Mathematical model of steam generator feed system at power unit of nuclear plant
    Raskin, E. M.
    Denisova, L. A.
    Sinitsyn, V. P.
    Nesterov, Yu V.
    AUTOMATION AND REMOTE CONTROL, 2011, 72 (05) : 1118 - 1126
  • [34] Development of an integrity evaluation system for steam generator tubes in a nuclear power plant
    Kim, J. C.
    Lee, S. M.
    Chang, Y. S.
    Choi, J. B.
    Kim, Y. J.
    Choi, Y. H.
    SAFETY AND STRUCTURAL INTEGRITY 2006, 2007, 120 : 157 - +
  • [35] Waveguide ultrasonic liquid level transducer for nuclear power plant steam generator
    Melnikov, VI
    Khokhlov, VN
    NUCLEAR ENGINEERING AND DESIGN, 1997, 176 (03) : 225 - 232
  • [36] Leak behavior of SCC degraded steam generator tubings of nuclear power plant
    Hwang, SS
    Kim, HP
    Kim, JS
    Kasza, KE
    Park, J
    Shack, WJ
    NUCLEAR ENGINEERING AND DESIGN, 2005, 235 (23) : 2477 - 2484
  • [37] OPTIMUM OUTPUT FEEDBACK CONTROL FOR A STEAM GENERATOR OF A NUCLEAR POWER PLANT.
    Elmadbouly, E.
    1600, (09):
  • [38] Probabilistic safety analysis of the Unterweser Nuclear Power Plant - Scope, methods, results
    Breiling, G
    Grubel, H
    Oehmgen, T
    ANNUAL MEETING ON NUCLEAR TECHNOLOGY '99, PROCEEDINGS, 1998, : 209 - 212
  • [39] Research on water level control calculation of steam generator in nuclear power plant
    Qiu, Suizheng
    Zhang, Linling
    Guo, Yujun
    Su, Guanghui
    Yu, Zhenwan
    Jia, Dounan
    Hedongli Gongcheng/Nuclear Power Engineering, 1997, 18 (02): : 140 - 145
  • [40] PERIODICAL CHEMICAL CLEANING OF THE STEAM-GENERATORS SECONDARY SIDE AT THE GREIFSWALD NUCLEAR-POWER-PLANT LEUSCHNER,BRUNO
    DIETRICH, P
    KERNENERGIE, 1990, 33 (09): : 356 - 359