The author outlines the perspectives of nuclear engineering and reports the experience gained in constructing and operating gas-cooled reactors, heavy and light water reactors dealing with corrosion problems in the steam generators of PWRs and in the pressure tubes of PHWRs, standardization of PWRs, full power test of reactor coolant pumps and in-service inspection of reactor pressure vessels. The summary on cooling systems discusses calculation methods of the plume behavior, optimization of systems with direct cooling towers and trends in the development of hybrid cooling towers.
引用
收藏
页码:1 / 14
相关论文
共 50 条
  • [41] ENVIRONMENTAL EFFECTS OF THERMONUCLEAR FUSION POWER REACTORS.
    Pocock, Rowland F.
    Nuclear Engineer, 1983, 24 (01): : 15 - 17
  • [42] CONTROL DEVICES FOR GAS-COOLED NUCLEAR REACTORS.
    McPhie, J.M.
    Effluent & Water Treatment Journal, 1972, 39 (04): : 115 - 124
  • [43] PROPOSAL FOR THE HANDLING OF OUT OF CONTROL SUPERCRITICAL NUCLEAR REACTORS.
    Clarke, M.C.
    Kemeny, L.G.
    CEA, Chemical Engineering in Australia, 1987, 12 (01): : 11 - 13
  • [44] 'TALLEST' VBM OPENS WAY TO BIGGER NUCLEAR REACTORS.
    Pond, James B.
    Iron Age, 1976, 218 (12): : 44 - 46
  • [45] 2300 MWe Nuclear Power Station With Gas-Cooled High-Temperature Reactors.
    Waage, J.U.
    Fischer, P.U.
    Meyer, L.
    1600, (24):
  • [46] Vertical Direct Flow Steam Generator for Nuclear Power Plants with Water Cooled Water Moderated Power Reactors.
    Glebov, V.P.
    Moskivichev, V.F.
    Simkin, B.P.
    Eskin, N.B.
    Artemov, L.N.
    Grebennikov, V.N.
    Ulasov, V.M.
    Terent'ev, I.K.
    Marinich, A.M.
    Shvarts, A.L.
    Godik, I.B.
    Afanasev, B.P.
    Teploenergetika, 1983, (02): : 17 - 20
  • [47] PROSPECTS OF POWER RAMPING AND CYCLING SUPERVISION IN FINNISH POWER REACTORS.
    Antila, M.
    Kaikkonen, H.T.
    Mannola, E.
    Res Mechanica: International Journal of Structural Mechanics and Materials Science, 1985, 16 (04): : 297 - 308
  • [48] ″ CONVOY ″ SATURATED STEAM TURBINE GENERATOR UNITS FOR NUCLEAR POWER PLANTS WITH PRESSURIZED WATER REACTORS.
    ZOERNER, WALTER
    1982, V 4 (N 4): : 183 - 186
  • [49] Optimization of the Low-Potential Complex of Nuclear Power Plants with Water-Cooled Reactors.
    Berman, L.D.
    Rubinshtein, Ya.M.
    Popyrin, L.S.
    Zisman, S.L.
    Mai, V.A.
    Naumov, Yu.V.
    Teploenergetika, 1977, (05): : 15 - 20
  • [50] Chemical Procedures during the Start-Up of Nuclear Power Plants with Pressurized Water Reactors.
    Gebauhr, W.
    Graemer, G.
    Olijve, J.G.
    Riess, R.
    Schoeder, H.J.
    1600, (55):