共 50 条
- [21] Optimization model and algorithm of modular garment production process scheduling with resource constraints Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2024, 30 (06): : 2148 - 2158
- [22] Modeling and Heuristic Algorithm of Ground Ferry Vehicle Scheduling in Large Airports CICTP 2019: TRANSPORTATION IN CHINA-CONNECTING THE WORLD, 2019, : 159 - 170
- [23] Heuristic algorithm for flexible resource-constrained project scheduling problem Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1846 - 1855
- [24] A Novel Heuristic Algorithm for Spatial Resource Constrained Project Scheduling Problem INFORMATION TECHNOLOGY FOR MANUFACTURING SYSTEMS II, PTS 1-3, 2011, 58-60 : 1448 - 1453
- [25] Optimized resource scheduling using the meta heuristic algorithm in cloud computing 1600, International Association of Engineers (47): : 360 - 366
- [26] Mathematical Model and Heuristic based Subtask Scheduling Algorithm for order scheduling RECENT DEVELOPMENTS IN MATHEMATICAL ANALYSIS AND COMPUTING, 2019, 2095
- [27] Heuristic Algorithm in Optimizing Stochastic Resource-Constrained Project Scheduling INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 1, PROCEEDINGS, 2009, : 975 - +
- [28] Task scheduling optimization in cloud computing based on heuristic Algorithm Guo, L. (kftjh@yahoo.com.cn), 1600, Academy Publisher (07):
- [30] Optimization of shipyard space allocation and scheduling using a heuristic algorithm Journal of Marine Science and Technology, 2013, 18 : 404 - 417