Structure selection of pump units of south-north water transfer project in the east of China

被引:0
|
作者
Qiu, Baoyun [1 ]
Huang, Jiyan [1 ]
Yuan, Shouqi [2 ]
Huang, Haitian [3 ]
Lu, Yizhong [3 ]
Feng, Xusong [4 ]
机构
[1] Yangzhou Univ., Yangzhou 225009, China
[2] Jiangsu Univ., Zhenjiang 212013, China
[3] North Jiangsu Water Supply Bur., Nanjing, China
[4] Jiangsu Water Conservancy Bur., Nanjing, China
关键词
Selection; -; Stability;
D O I
10.3901/jme.2003.01.069
中图分类号
TH3 [泵];
学科分类号
080704 ;
摘要
In the light of the characteristics of south-to-north water transfer project in the east of China, the requirements of step pump stations of the project for pump units are analyzed. According to the application situation of low head large pump units and the available technique level, the reliability, maintainability, circumstance protection, investment, performance cost, reasonable capacity, pump type, motor type, axial type and key structures of the pump units are advanced to promote benefits of the project. The results are worth referencing to plan, equipment selection and performance maintenance of the project.
引用
收藏
页码:69 / 73
相关论文
共 50 条
  • [42] Eco-environmental benefit assessment of China's South-North Water Transfer Scheme - the middle route project
    Duan, GM
    Zhao, JZ
    Liu, GH
    Ke, B
    Xiao, H
    Wu, G
    Deng, HB
    JOURNAL OF ENVIRONMENTAL SCIENCES, 2004, 16 (02) : 308 - 315
  • [43] The impact of the South-North Water Transfer Project (CTP)'s central route on groundwater table in the Hai River basin, North China
    Ye, Aizhong
    Duan, Qingyun
    Chu, Wei
    Xu, Jing
    Mao, Yuna
    HYDROLOGICAL PROCESSES, 2014, 28 (23) : 5755 - 5768
  • [44] Institutional change and the political economy of water megaprojects: China's south-north water transfer
    Pohlner, Huw
    GLOBAL ENVIRONMENTAL CHANGE-HUMAN AND POLICY DIMENSIONS, 2016, 38 : 205 - 216
  • [45] A Study on Ethical Issues in the South-North Water Diversion Project
    Wang Yuan-xu
    2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING - 22ND ANNUAL CONFERENCE PROCEEDINGS, VOLS I AND II, 2015, : 1845 - 1852
  • [46] Using incentives to coordinate responses to a system of payments for watershed services: The middle route of South-North Water Transfer Project, China
    Sheng, Jichuan
    Webber, Michael
    ECOSYSTEM SERVICES, 2018, 32 : 1 - 8
  • [47] Incentive-compatible payments for watershed services along the Eastern Route of China's South-North Water Transfer Project
    Sheng, Jichuan
    Webber, Michael
    ECOSYSTEM SERVICES, 2017, 25 : 213 - 226
  • [48] Water environmental quality evaluation based on visualize classification for Huangbizhuang reservoir of South-North Water Transfer Project
    Zhang, Dalei
    Li, Yihan
    Sun, Yingjie
    Qiao, Fan
    Lv, Mou
    AUTOMATION EQUIPMENT AND SYSTEMS, PTS 1-4, 2012, 468-471 : 2955 - 2958
  • [49] Ecosystem structure and function of the main channel of the middle route of south-north water diversion project
    Tang, Jian-Feng
    Xiao, Xin-Zong
    Wang, Ying-Cai
    Hu, Sheng
    Wang, Yuan
    Zhongguo Huanjing Kexue/China Environmental Science, 2020, 40 (12): : 5391 - 5402
  • [50] Incorporating water consumption into crop water footprint: A case study of China's South-North Water Diversion Project
    Wei, Yuhang
    Tang, Deshan
    Ding, Yifan
    Agoramoorthy, Govindasamy
    SCIENCE OF THE TOTAL ENVIRONMENT, 2016, 545 : 601 - 608