FLOOR CONSTRUCTION WITH PUMPED CONCRETE.

被引:0
|
作者
Anon
机构
来源
| 1600年 / 18期
关键词
402 Buildings and Towers - 405 Construction Equipment and Methods; Surveying;
D O I
暂无
中图分类号
学科分类号
摘要
Techniques of pump placing of concrete used in concrete floor construction and pumping operations are evaluated.
引用
收藏
相关论文
共 50 条
  • [31] Burgberg Tunnel in Open and Closed Method of Construction, Using Waterproof Concrete.
    Bienstock, Rudolf
    Eing, Rolf
    Kuhnhenn, Karl
    Bautechnik, 1987, 64 (01) : 9 - 17
  • [32] Investigation of 12 m Long Hollow Floor Slabs Made of Expanded Clay Concrete.
    Kornev, N.A.
    Musaelyan, B.A.
    Rozenbaum, A.G.
    Beton i Zhelezobeton, 1973, (02): : 4 - 6
  • [33] The ZD-Shell. Construction with Hollow Girder Elements of Reinforced Concrete.
    Jllies, K.H.
    Beton, 1972, 22 (12): : 541 - 544
  • [34] Fiber Reinforced Concrete.
    Johnston, Colin D.
    Revista IMCYC (Instituto Mexicano del Cemento y del Concreto), 1981, 19 (127): : 35 - 63
  • [35] FORMWORK FOR TOOLED CONCRETE.
    Richardson, John G.
    Concrete Construction - World of Concrete, 1984, 29 (04):
  • [36] BURNING THROUGH CONCRETE.
    Szychlinski, Grzegorz
    Concrete International, 1985, 7 (10) : 51 - 54
  • [37] FIBRE REINFORCED CONCRETE.
    Anon
    1600, (13):
  • [38] USE OF POLYMERS IN CONCRETE.
    Ohama, Yoshihiko
    Yogyo Kyokai Shi/Journal of the Ceramic Society of Japan, 1979, 87 (1002): : 65 - 76
  • [39] COMPOSITION OF FRESH CONCRETE.
    Barber, P.M.
    Quarry Management, 1984, 11 (04): : 227 - 228
  • [40] DIAMOND GRINDING OF CONCRETE.
    Trussell, Thomas T.
    Concrete Construction - World of Concrete, 1986, 31 (11):