Tunnelling machine development for undersea projects - a review of the issues

被引:0
|
作者
机构
[1] Robbins, Richard
[2] Kelley, Martin
来源
Robbins, Richard | 1600年 / 09期
关键词
Pressure bulkhead shields - Probe drilling - Risk sharing - Undersea tunnels;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] Experimental study of salt-resisting slurry for undersea shield tunnelling
    Cui, Wei
    Liu, Dong
    Song, Hui-fang
    Zhang, She-rong
    He, Sun-wen
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2020, 98 (98)
  • [22] BENTONITE TUNNELLING MACHINE
    BARTLETT, JV
    BIGGART, AR
    TRIGGS, RL
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1973, 54 (NOV): : 605 - 624
  • [23] Contracting issues for conventional tunnelling
    Munfah, Nasri
    UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 1559 - 1564
  • [24] Streamlining Tunnelling Projects through BIM
    Massimo-Kaiser, Ines
    Exenberger, Hans
    Hruschka, Sabine
    Heil, Frederic
    Flora, Matthias
    SUSTAINABILITY, 2022, 14 (18)
  • [25] General Risks For Tunnelling Projects: An Overview
    Siang, Lee Yong
    Ghazali, Farid E. Mohamed
    Zainun, Noor Yasmin
    Ali, Roslinda
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE OF GLOBAL NETWORK FOR INNOVATIVE TECHNOLOGY AND AWAM INTERNATIONAL CONFERENCE IN CIVIL ENGINEERING (IGNITE-AICCE'17): SUSTAINABLE TECHNOLOGY AND PRACTICE FOR INFRASTRUCTURE AND COMMUNITY RESILIENCE, 2017, 1892
  • [26] EFFECTS OF THE ENVIRONMENT ON IMMERSED TUNNELLING PROJECTS
    INTVELD, JK
    KNOOK, TWT
    WERNER, J
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1988, 3 (04) : 359 - 361
  • [27] Critical issues in abandoned information systems development projects
    EwusiMensah, K
    COMMUNICATIONS OF THE ACM, 1997, 40 (09) : 74 - 80
  • [28] Defects and Agility: Localization Issues in Agile Development Projects
    Ressin, Malte
    Abdelnour-Nocera, Jose
    Smith, Andy
    AGILE PROCESSES IN SOFTWARE ENGINEERING AND EXTREME PROGRAMMING, 2011, 77 : 316 - 317
  • [29] Issues of organizational behaviour in effort estimation for development projects
    Busby, J.S.
    Payne, K.
    International Journal of Project Management, 1999, 17 (05): : 293 - 300
  • [30] WORK FORCE DEVELOPMENT ISSUES IN EXECUTING INDUSTRIAL PROJECTS
    REDDING, MJ
    CIVIL ENGINEERING FOR PRACTICING AND DESIGN ENGINEERS, 1982, 1 (01): : 1 - 9